ETEK5 MANUAL 57
MAINTENANCE
CONTINUED
Clean and check the condition of the single internal 005 NBR 90 o-ring in the
front of the OOPS insert and replace if necessary
(see figure 31G)
. Lubricate this
o-ring liberally using Eclipse Grease.
Lubricate the narrow end of the OOPS pin with a smear of Eclipse Grease and
push the OOPS pin, narrow end first, into the OOPS insert so that it sits in the
OOPS insert and pokes through to the front
(see figures 31H & 31I)
.
Screw the OOPS insert back into the OOPS body ensuring that the o-ring end
goes in first.
Replace the push rod into its designated slot
(see figure 31J)
then side 004 NBR
70 o-rings onto both ends of the push rod. Make sure the push rod is centred in
the OOPS body
(see figure 31K)
.
Slide the OOPS knob over the OOPS body and screw the OOPS knob onto the
OOPS body
(see figure 31L)
.
Reconnect the macroline hose to the fitting on the OOPS body
(see figure 31M)
.
You have now successfully cleaned and maintained your On/Off Purge System.
FIG 31G
FIG 31I
FIG 31H
FIG 31J
WARNING!
If you are unsure about performing a maintenance procedure please
contact your nearest service centre.
WARNING
FIG 31M
FIG 31K
FIG 31L
Содержание ETEK 5
Страница 1: ...USER MANUAL ENGLISH EDITION ...
Страница 78: ...NOTES 78 ETEK5 MANUAL ...
Страница 79: ...ETEK5 MANUAL 79 NOTES ...