Chengdu Ebyte Electronic Technology Co.,Ltd.
E180-Z5812SX User Manual
Copyright ©2012–2021, Chengdu Ebyte Electronic Technology Co., Ltd.
18
FF
Reply: FA 21
Reply: FA 21
Device restart
Send: FD 00 12 FF
Reply: FA 12
Send: FD 00 12 FF
Reply: FA 12
reset
Send: FD 00 13 FF
Reply: FA 13
Send: FD 00 13 FF
Reply: FA 13
Configure the delayed printing
time for AUX to wake up the
external MCU serial port in the
wireless receiving state
Send: FD 01 35 AUX_delaytime FF
Reply: FA 35
Send: FD 01 35 04 FF
Reply: FA 35
Configure serial port wake-up hold
time
Send: FD 01 36 Uart_holdtime FF
Reply: FA 36
Send: FD 01 36 64 FF
Reply: FA 36
Configure endpoint information
Send: FD 05 37 Endpoint_info FF
Reply: FA 37
Send: FD 05 37 01 FE B0
05 04 FF
Reply: FA 37
Configure the trust center
connection key
Send: FD 10 38 TrustCentLinkKey FF
Reply: FA 38
Send: FD 10 38
5A 69 67 42 65 65 41 6C
6C 69 61 6E 63 65 30 39
FF
Reply: FA 38
6.5.3 Commands for Network Configuration
Open Network
Send: F5 01 40 01 FF
Reply: FC 40 00
Send: F5 01 40 01 FF
Reply: FC 40 00
Leave Network
Send: F5 01 40 02 FF
Reply: FC 40 00
Send: F5 01 40 02 FF
Reply: FC 40 00
New Network
Send: F5 01 40 03 FF
Reply: FC 40 00
Send: F5 01 40 03 FF
Reply: FC 40 00
Open Network: The main coordinator node is effective, which means that the open network allows the terminal to
join for a period of time. The command configures the "centralized network open time" parameter. This command
is invalid for the terminal and the sleeping terminal. Only the coordinator node (E180-ZG120A/B) is valid .
Leave Network: The coordinator executes this command to clear the original network, and at the same time creates
a new network. The terminal node executes this command to clear the saved network, and then executes the restart
or new network command to join the new network.
New Network: mainly for terminals, execute this command to join a new network, you need to leave the network
and then execute the new network to join the new network.