12 Sample project
12.6 Diagnostics messages
XN-312-GW-EC gateway 07/20 MN050010-EN
Eaton.com
85
The program will be loaded onto the PLC's RAM and will then be run. In addi-
tion, a boot application will be generated so that this will be the program that
is run every time the PLC boots.
green icons in the configuration tree indicate that communication is start-
ing and the program is running.
Figure 54:
XSOFT-CODESYS-3 in ONLINE mode
12.6 Diagnostics messages
If the planned configuration on the Ethercat gateway does not match the
actual configuration (i.e., the physically present configuration), the EtherCAT
master will not start running. If communication cannot be successfully estab-
lished, you can use the following diagnostic options:
EtherCAT_Master/ diagnostics
The EtherCAT_Master/General tab provides a general description in the
"Diagnostic message" field.
Figure 55:
Diagnostic message in EtherCAT_Master/General tab
Содержание XN-312-GW-EC
Страница 1: ...Manual EtherCAT gateway XN 312 GW EC 07 20 MN050010 EN...
Страница 4: ...II...
Страница 12: ...0 About this manual 0 5 Writing conventions 8 XN 312 GW EC gateway 07 20 MN050010 EN Eaton com...
Страница 68: ...10 XN300 Assist 10 1 Firmware update with XN300 Assist 64 XN 312 GW EC gateway 07 20 MN050010 EN Eaton com...
Страница 95: ...12 Sample project 12 7 What will be transferred XN 312 GW EC gateway 07 20 MN050010 EN Eaton com 91...
Страница 102: ...12 Sample project 12 8 Finding XN300 slice module PDOs and SDOs 98 XN 312 GW EC gateway 07 20 MN050010 EN Eaton com...
Страница 130: ...126 XN 312 GW EC gateway 07 20 MN050010 EN Eaton com...