4 Commissioning
4.5 Engineering the module
28
DX-NET-ETHERCAT-2
01/14 MN040009EN
www.eaton.com
▶
Switch the device on (turn on the power supply!).
▶
Now configure the project. (For information on a detailed configuration,
please consult the manual provided by the PLC‘s manufacturer.)
▶
Check the LED indicators.
The head-end controller must recognize the device address and the
module must light up green (
Section 2.2, “LED indicators“).
L1/L L2/N L3
DC-
EtherCAT
RUN
ERR
Содержание PowerXL DX-NET-ETHERCAT-2
Страница 4: ...II ...
Страница 20: ...2 Engineering 2 2 LED indicators 16 DX NET ETHERCAT 2 01 14 MN040009EN www eaton com ...
Страница 28: ...3 Installation 3 7 Install field bus 24 DX NET ETHERCAT 2 01 14 MN040009EN www eaton com ...
Страница 54: ...4 Commissioning 4 12 CoE communication objects 50 DX NET ETHERCAT 2 01 14 MN040009EN www eaton com ...