INSTALLATION
EATON
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 4
www.eaton.com/powerquality
28
9.
Attach the EBM front cover:
Align the pins on the rear of the front cover with the openings in the EBM. Push
the cover firmly into place. See Figure 14.
Mounting
Bracket
6-32 Flat-Head
Screws
Figure 14. Installing the EBM Mounting Brackets
10.
Slide the EBM into the rack.
11.
Secure the front of the EBM to the rack using two hex-head screws in each
mounting bracket as shown in Figure 15.
Hex-Head
Screws
Figure 15. Securing the EBM Mounting Brackets
Содержание Powerware Series
Страница 1: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Страница 2: ......
Страница 3: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Страница 84: ...OPERATION EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 76 ...
Страница 112: ...SPECIFICATIONS EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 104 ...
Страница 119: ......
Страница 120: ... 1642016494 164201649 4 ...