INSTALLATION
EATON
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 4
www.eaton.com/powerquality
37
Installing the UPS Internal Batteries
C
A
U
T
I
O
N
The UPS internal batteries are heavy (see page 99). Each battery tray holds two rows of five batteries. Use
caution when handling the heavy battery trays.
To install the battery trays into the UPS cabinet:
1.
Verify that the circuit breakers on the UPS rear panel are in the OFF (O) position
(see Figure 32 on page 43).
2.
Remove the eight screws on the battery cover plate and retain. Remove the
plate and retain. See Figure 26.
Figure 26. Removing the UPS Battery Cover Plate
3.
Slide the battery trays into the cabinet (see Figure 27). Verify that each tray is
properly aligned before sliding the tray in.
When a tray is fully installed, tuck the plastic handle on the end of the tray into
place.
Figure 27. Installing the UPS Battery Trays
4.
Reinstall the battery cover plate.
Содержание Powerware Series
Страница 1: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Страница 2: ......
Страница 3: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Страница 84: ...OPERATION EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 76 ...
Страница 112: ...SPECIFICATIONS EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 104 ...
Страница 119: ......
Страница 120: ... 1642016494 164201649 4 ...