Installing Communication Options and Control Terminals
To install the communication options and control terminals:
1.
Install the appropriate X-Slot card and/or necessary cable(s) (see Figure 46 and
Figure 47).
Figure 47. Installing Communication Cables
2.
Connect the cables to the appropriate location.
See “Communication Options” on page 79 or “Control Terminals” on page 81
for detailed information.
3.
Route and tie the cable(s) out of the way.
4.
Continue to “Operation” on page 63 to start up the UPS.
Содержание Powerware Series
Страница 1: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Страница 2: ......
Страница 3: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Страница 84: ...OPERATION EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 76 ...
Страница 112: ...SPECIFICATIONS EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 104 ...
Страница 119: ......
Страница 120: ... 1642016494 164201649 4 ...