INSTALLATION
Eaton 9140 UPS (7.5–10 kVA) User's Guide
S
164201622 Rev 3
www.eaton.com/powerquality
48
9.
To change the factory-set defaults, see “User Settings” on
page 64.
10.
Turn the UPS on by selecting MENU from the system status
screen, then select CONTROL, OUTPUT CONTROL, UPS TO
ONLINE, and OK to confirm.
The
indicator illuminates solid. The UPS is now in Normal mode
and supplying power to your equipment.
If the alarm beeps or a UPS alarm indicator stays on, see
“Troubleshooting” on page 95.
11.
If you installed an optional REPO or ROO, test the REPO or ROO
function:
Activate the external REPO or ROO switch. Verify the status
change on the UPS display.
Deactivate the external REPO or ROO switch and restart the UPS.
12.
If optional EBMs are installed, continue to “Configuring the UPS for
EBMs” on page 72.
NOTE
The batteries charge to 80% capacity in less than 5 hours. However, it is
recommended that the batteries charge for 48 hours after installation or long-term storage.
Содержание Powerware 9140
Страница 1: ...Powerware Series Eaton 9140 UPS 7 5 10 kVA User s Guide...
Страница 26: ...SAFETY WARNINGS Eaton 9140 UPS 7 5 10 kVA User s Guide S 164201622 Rev 3 www eaton com powerquality 20...
Страница 80: ...OPERATION Eaton 9140 UPS 7 5 10 kVA User s Guide S 164201622 Rev 3 www eaton com powerquality 74...
Страница 96: ...UPS MAINTENANCE Eaton 9140 UPS 7 5 10 kVA User s Guide S 164201622 Rev 3 www eaton com powerquality 90...
Страница 106: ...TROUBLESHOOTING Eaton 9140 UPS 7 5 10 kVA User s Guide S 164201622 Rev 3 www eaton com powerquality 100...