![Eaton Powerware 9140 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/eaton/powerware-9140/powerware-9140_user-manual_3938182027.webp)
Eaton 9140 UPS (7.5–10 kVA) User's Guide
S
164201622 Rev 3
www.eaton.com/powerquality
21
Chapter 3
Installation
This section explains:
S
Equipment inspection
S
Unpacking the cabinet
S
Extended Battery Module (EBM) setup and installation, including
EBM batteries
S
UPS setup and installation, including UPS internal batteries
S
Remote emergency power-off (REPO) or remote on/off (ROO)
installation
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file
a claim for shipping damage. If you discover damage after acceptance,
file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.
NOTE
Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.
Содержание Powerware 9140
Страница 1: ...Powerware Series Eaton 9140 UPS 7 5 10 kVA User s Guide...
Страница 26: ...SAFETY WARNINGS Eaton 9140 UPS 7 5 10 kVA User s Guide S 164201622 Rev 3 www eaton com powerquality 20...
Страница 80: ...OPERATION Eaton 9140 UPS 7 5 10 kVA User s Guide S 164201622 Rev 3 www eaton com powerquality 74...
Страница 96: ...UPS MAINTENANCE Eaton 9140 UPS 7 5 10 kVA User s Guide S 164201622 Rev 3 www eaton com powerquality 90...
Страница 106: ...TROUBLESHOOTING Eaton 9140 UPS 7 5 10 kVA User s Guide S 164201622 Rev 3 www eaton com powerquality 100...