56
9395P 250 kVA / 275 kVA / 300 kVA
User’s and Installation Guide
5.2 Installing distributed bypass control wiring
NOTE
When installing external wiring to the HotSync CAN Bridge Card terminals, route the wiring
through the internal opening in the X-Slot communication bay.
To install distributed bypass control wiring:
1. Verify the UPS system is turned off and all power sources are disconnected. See Chapter 7: “UPS
operating instructions” for shutdown instructions.
2. Perform the procedure listed in Section 5.1.
3. Terminal block TB3 is accessible on the left side of the X-Slot communication bay (see
To gain access to terminal block TB1, TB2, and the left interface entry conduit landing
plates,
loosen the screws securing the top protective cover panel and remove the panel. This panel
is to
the right of the X-Slot communication bay (see Figure
1
dware for
later use.
4. Remove the interface entry conduit landing plates to drill or punch holes (see Figure
4-4
).
5. Reinstall the interface entry plates and install the conduit.
6. To locate the appropriate terminals and review the wiring and termination requirements, see Section
3.2.4, Table
4-1, and Figure
4-
16
through Figure
4-
19
.
7. Route and install CAN wiring between the UPS cabinets. See Figure
5-2 and Table
for the
HotSync CAN Bridge Card terminal location and Figure
5-3, Figure
information.
8. If a tie cabinet with Module Output Breakers (MOBs) is being wired, proceed to Step 11;
otherwise, proceed to Step 9.
9. Route and install distributed bypass system pull-chain wiring between the UPS cabinets. See
Figure
5-5 and Table
5-3 for wiring information.
11. Route and install distributed bypass system pull-chain wiring between the UPS cabinets and tie
cabinet MOBs. See Figure
5-6 and Table
5-4 for wiring information.
NOTE
Setup of the HotSync CAN Bridge Card for parallel operation must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative to
schedule a date.
12. Reinstall the protective cover panel and secure with the cabinet mounted screws.
13. Close the front door and secure the latch.
14. If removed, reinstall the safety shield panel removed in Section 5.1, Step 5. Secure with the
retained hardware.
15. If removed, reinstall the left front panel removed in Section 5.1, Step 4 and secure with the
retained hardware.
Содержание Power Xpert 9395P 250 kVA
Страница 1: ...User s and Installation Guide Power Xpert 9395P UPS 250 kVA 275 kVA 300 kVA...
Страница 2: ......
Страница 3: ...Power Xpert 9395P UPS 250 kVA 275 kVA 300 kVA User s and Installation Guide...
Страница 168: ......
Страница 169: ......
Страница 170: ...614 01919 00...