
10
OnGuard Command Console
Installation Manual
ONGUARD COMMAND CONSOLE INSTALLATION MANUAL
www.eaton.com/onguard
SECTION III - Assembling the Console
1
4
2
3
NOTICE
IN ORDER TO ENABLE EASY LIFT MOTOR DIAGNOSTICS (IF
EVER REQUIRED),THE LIFT MOTORS MUST BE PLUGGED INTO
THE CORRESPONDING NUMBERED RECEPTACLES ON THE
CONTROL BOX. THE LIFT MOTOR NUMBERS ARE SHOWN IN
THE DIAGRAM AT RIGHT.
3� Route (2) lift motor cables from the rear lift motors (# 2
and 3) to the control box, plugging the cables into the
appropriate numbered receptacles in the control box�
(Motor cable #2 is shown; motor cable #3 will follow a
similar path through the right support frame�)
4� Route (2) lift motor cables from the outer lift motors (#1
and #4) to the control box, plugging the cables into the
appropriate numbered receptacles in the control box�
(Motor cable #1 is shown; motor cable #4 will follow a
similar path through the right support frame�) The cable
for lift motor (#1) should be inserted into the control box’s
cable retention groove to neatly reach the opposite side
of the box�
Power Cord
Lift Motor
Cable #1
Cable Retention
Groove
LH Worksurface
Support Frame
Lift
Motor
Cable #2
C�3
C�4