InsulGard System Installation and Start Up Guideline 

 

33 

Appendix 3. PD Sensors Designation in Database  

 
Common rules for sensor designation in InsulGard database: 
 

1 - for upper switchgear cubical part
2 - for bottom switchgear cubical part
 - omitted for non divided cubical

Phase: 

A

, or 

B

, or 

C

, or 

N

 - for RFCT sensor

installed on all three feeder shield ground wires

- Switchgear cubical # counted from line left side
- RTD-6 PD output #
-  can be omitted if applicable

Sensor Type:

CC_   - IPDS sensor
CT_   - RFCT sensor
CTb   - RFCT on bottle grounding wire
RTm  - RTD-6 PD sensor (new design)
RTD  -  RTD-6 PD sensor (old design)

C C _ 0 2  A  2

 

 
Typically the InsulGard monitor comes preconfigured in accordance with available information on the application and 
the configuration worksheet filled out at the time of order entry (see example below of PD sensor location on a 
switchgear line). Switching InsulGard devices can require significant reprogramming of database software and 
InsulGard firmware settings and can lead to errors. 
  
 
InsulGard ID: SWG 72YJ573, VS #6 

Insulgar
d  
Channe
l # 

Sensor Type 

CC 

– Coupling Capacitor (IPDS)

 

CT- CT on cable shield ground

 

CTb - CT on a bottle shield 
ground

 

(

Rule 1

)

 

Cubicle 
Position from 
left to right

 

(

Rule 2

)

 

Vertical Position 

1  

for Top  or

 

2  

for Bottom 

compartment (if 
applicable)

 

(

Rule  2

Phase: 

Combined 
Sensor 
Name 
(

Rule  3

(

Rule 4

)

 

(A / B / C/ N) 

CC 

CC_02 A2 

CC 

CC_02 B2 

CC 

CC_02 C2 

CC 

CC_05 A2 

CC 

CC_05 B2 

CC 

CC_05 C2 

CC 

CC_08 A2 

CC 

CC_08 B2 

CC 

CC_08 C2 

10 

    CT 

CT_03 N1 

11 

    CT 

CT_04 N2 

12 

    CT 

CT_05 N2 

13 

    CT 

CT_06 N2 

14 

    CT 

CT_08 N2 

15 

    CT 

CT_09 N2 

 
Sensor designations in this table indicate:  

 

type of the sensor (CC_ - IPDS)  

 

place of installation (02 

– line up vertical section - cubicle position counted from left to right)  

 

bus or feeder phase (A), (For RFCT sensors (CT) installed on all three feeder shield ground wires its phase 
designated as N 

– neutral) 

 

part of  the vertical section if applicable (2 - bottom part)  

 

 

 

Содержание InsulGard

Страница 1: ...InsulGard InsulGard System Installation and Start Up Guideline Version 1 April 2018...

Страница 2: ...ear line 18 2 START UP 19 2 1 Getting ready 19 2 2 Insulgard Software Installation and Communication Establishing 19 2 3 Verifying Correcting Configuration 21 2 4 PD Channel Calibration Verification 2...

Страница 3: ...shipping damage Verify that it is exactly the device designated for this project Identify place and way of sensors and InsulGard installation Identify and verify proper power and communication lines...

Страница 4: ...ection 1 2 Link and their connection to Insulgard monitor Also some external interfaces can be connected to the Insulgard to remotely get information about the monitor and monitored object condition T...

Страница 5: ...installed sensor The maximum distance allowed between the PD sensors and the InsulGard coaxial cables length is 150 feet a For a motor the best location of InsulGard enclosure installation is as close...

Страница 6: ...e inside InsulGard for 230VAC application Time Lag 100mA 250VAC 5X20mm type 5ST by BEL Fuse Inc Catalog 5ST 100 Fuse on the panel Fast Acting 3 0A 250VAC 5x20mm type 5MF by Bel Fuse Inc Catalog 5MF 3...

Страница 7: ...cable from the Sensor Interface Board on the left side of the monitor Use latching levers on both sides of the connector see picture below in small steps to lift the connector and then pull the conne...

Страница 8: ...els 1 15 PD sensors must be connected accordingly For motor generator application connect IPDS sensors on phases A B and C starting with channel 1 and then connect RTD PD sensors For switchgear applic...

Страница 9: ...connection and connection to relays to RS485 and 4 20mA interfaces Use green plugs on the right side of the InsulGard Figure 1 6 and 1 8 The green plugs can be wired when the InsulGard is not install...

Страница 10: ...face port 1 2 Installation of the InsulGard Sensors Monitored object and InsulGard must be de energized The best way to de energize InsulGard is to de energize the incoming power supply line On a pane...

Страница 11: ...direction of the arrow on the sensor s label to Ground Be sure that the wires grounding feeder shields don t touch grounding surface before they go through the sensor Figure 1 10b a Coax cable connec...

Страница 12: ...e metering verify proper reading on customer s metering system 2 Auxiliary sensors a TS External Temperature sensor 3 wire 100 Ohm platinum RTD in protecting shell For rotating machines using spare 10...

Страница 13: ...uxiliary sensors connection a Units mounted on a panel and inside enclosures will generally have external temperature and humidity sensors Check that external sensors are properly wired to the Sensor...

Страница 14: ...connection for a motor is shown in Figure 1 12 The sensors are a Three IPDS sensor installed in the motor terminal box b One RTD 6 PD Sensor Board installed in motor RTD terminal box For large motors...

Страница 15: ...nel Sensor Sensor designation in data base 1 IPDS Phase A CC_A 2 IPDS Phase B CC_B 3 IPDS Phase C CC_C 4 RTD 01 PD 1 output of RTD 6 sensor RTm01 5 RTD 02 PD 2 output of RTD 6 sensor RTm02 6 RTD 03 PD...

Страница 16: ...emote communications if required 1 2 conductor shielded wire for 4 20 ma output if required 1 6 conductor cable suitable monitoring of dry contacts for system status low alarm and high alarm minimum 2...

Страница 17: ...e sensor 5 Auxiliary sensors installation in the motor termination box a Install external Humidity sensors b Install external air Temperature sensor if supplied and no winding temperature RTD platinum...

Страница 18: ...dded in the Sensor Interface Board of the door mounted InsulGard External sensors are not required with this type of installation For PD sensors installation and their connection to InsulGard refer to...

Страница 19: ...fication procedure considered optional but highly recommended Print and use PD system installation checklist from Appendix 1 as a guideline for StartUp and Commissioning procedures and a core of the i...

Страница 20: ...ction has been chosen as the simplest and most reliable local communication You may have to install communication software first Refer to the corresponding paragraph of InsulGard User Manual 2 Start I...

Страница 21: ...ect the actual sensors configuration see Appendix 5 After correcting settings in software press Backup Settings in Unit Settings tab 6 Send correct settings by pressing Send Settings to Device button...

Страница 22: ...erator used set the generator pulse parameters Pulse Magnitude 10 Volt Pulse Width 100 nanoseconds Pulse repetition rate 1 10 kHz Magnitude and pulse repetition parameters are not critical Pulse width...

Страница 23: ...from Communications tab of the InsulGard software A measurement time is proportional to the number of active channels and will take approximately 1 5 minutes for maximum 15 active channels 2 Download...

Страница 24: ...cedure see above hasn t been performed and the equipment already energized it is possible to verify what PD sensors are connected to the Sensor Interface Board Check that PD sensor coax cables is not...

Страница 25: ...on For typical applications 50Hz 10Hz enter 275 degrees shift Automated phase shift measurement can be done only from the InsulGard keypad 1 Press Set key to enter the setup mode The password prompt s...

Страница 26: ...ngs from Device to synchronize settings in the monitor and software Click Update Data base with Device settings when phase shift settings discrepancy will be displayed 10 In InsulGard Unit Settings Ta...

Страница 27: ...that metering CT ratio is always Ict 5 If rated current was entered in the settings calculate Current Coefficient and enter it manually as CK 2 2 Ict If rated current was not changed in the settings f...

Страница 28: ...an take as long as 6 minutes After finishing measurements InsulGard will return to scrolling mode and will be ready for the next measurement 5 Repeat step 4 three more times 6 Once all measurements ar...

Страница 29: ...ansformer was used for power supply check voltage only between Line and Neutral Table 1 Link 8 Check IPDS sensor installation Make sure the sensors are reliably grounded Check clearance between sensor...

Страница 30: ...ase Line Measurements on Energized Equipment 20 StartUp 1 Software installed database corresponds to the object 2 Phase reference measurement is performed phase shift calculated 3 Load channel calibra...

Страница 31: ...te If insulating transformer was utilized for power supply check voltage between Line and Neutral only Table 2 Check Temperature and Load for motors only sensors Auxiliary sensor Resistance between co...

Страница 32: ...iguration for switchgear line The table below helps to avoid errors at PD sensor installation their cables termination and for report preparation Ch Sensor designation in database 1 Sensor measured re...

Страница 33: ...significant reprogramming of database software and InsulGard firmware settings and can lead to errors InsulGard ID SWG 72YJ573 VS 6 Insulgar d Channe l Sensor Type CC Coupling Capacitor IPDS CT CT on...

Страница 34: ...Guideline 34 Insulgard Settings for Channels in database have same designations of the sensors as in the above table If the sensors positions were changed at installation the sensor designation in th...

Страница 35: ...InsulGard System Installation and Start Up Guideline 35 Appendix 4 Door cutout dimensions for Door mount InsulGard Blue color shows InsulGard front panel dimension...

Отзывы: