![Eaton Green Motion Building Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/eaton/green-motion-building/green-motion-building_installation-manual_524609006.webp)
2
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN January 2022 www.eaton.com
00 Title
1.1 Field of applications
This installation manual is intended for professional and qualified personnel. It describes how to securely install the
Green Motion Building AC EV charger.
Table 1 . Overview of the Green Motion Building EV charger
Power input
AC EV charger
Input voltage
1 x 230 V (50 Hz) – 1 phase
3 x 400 V (50 Hz) – 3 phase
Input current
1 x 16 A (3.7 kW) – 1 phase
1 x 32 A (7.4 kW) – 1 phase
3 x 16 A (11 kW) – 3 phase
3 x 32 A (22 kW) – 3 phase
Power output
Output power
3.7 kW to 22 kW
Output type
Type 2 cable (Mode 3) or socket (T2 or T2S or Type E)
Type of cables
Straight
Simultaneous charging
1
Environmental
Operating temperature
-25 °C to +45 °C
Altitude
Up to 2000 m
Installation
Wall-mounted; indoor or outdoor
Humidity
< 95 % relative humidity
Mechanical
Mounting method
Wall-mounted
Floor-mounted column (optional)
Dimensions (W x H x D) in mm
285.5 x 264 x 116
Weight (without cables)
3 kg
Cable length
5 metres
Standards
Conformity
IEC 61851-1
Degree of protection
Earth fault protection
IP54
Built-in 30 mA AC and 6 mA DC RCMU
Impact strength
IK08
1.2 Symbols used in this manual
Hazardous behaviors that could cause serious injuries. Hazardous behaviors that could cause death.
Imminent danger of causing serious injuries or death.
Behaviors that could cause minor injuries to people or minor damages to property.
1.2.1 Related icons