40
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN January 2022 www.eaton.com
00 Title
9.3 Removing the plug
To remove the plug from the holder you need to pull it first vertically then horizontally. See Figure 25.
Figure 25 . Removing the plug from the Green Motion Building EV charger
Tag
Description
1
Green Motion Building EV charger
2
Type 2 connector
1
2
1
2
10. Maintenance
Installation, commissioning, maintenance or retrofitting of the EV charger must be performed by professional
and qualified personnel, who are responsible for complying with existing standards and local installation
regulations.
Before starting connection operations, ensure that the external AC-line main switch is disconnected, and
circuit breakers are open.
Any operation requiring the main converter box to be opened can lead to electric shock hazards.
The opening of the EV charger as well as any configuration changes must be carried out by professional and
qualified personnel in accordance with the local safety and electrical regulations and laws.
Wait at least 10 minutes before removing the Green Motion Building EV charger. The enclosure could
overheat during its operation or be heated by direct sunlight. To avoid burns from an overheated surface
caused by sunlight, please use suitable PPE or wait for the equipment to cool down before accessing it.