22
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN January 2022 www.eaton.com
00 Title
Table 7 . Configuration to limit maximum capacity of the EV charger
Green Motion Building EV charger version: 22 kW
Switch position
16 A
20 A
26 A
32 A
To be EV-ready compliant, one of the requirements is that the EV charger can execute an emergency stop in case of
contactor failure. In order to execute an emergency stop, the circuit breakers of the Green Motion Building EV charger
need to be equipped with a tripping coil/shunt trip, a device designed to switch the circuit breakers off remotely. The
shunt trip should have a DC voltage rating of 24 V and should be connected on the supply lead control wire, connected
to the E terminal of the EV charger. See the wiring diagram in Figure 11. The installation process should be done by an
EV-ready certified installer and following the requirements listed in this section.
6.5.1 Grid connection
Connect the EV charger to the electrical panel with the protections as per Table 8.
6.5 Installation of an external switching device
Table 8 . Recommendations for protections for the Green Motion Building EV charger
Green Motion Building EV charger model
Green Motion Building 22 kW EV charger
Green Motion Building power range
3.7 kW
7.4 kW
11 kW
22 kW
Charging current limitation
16 A
32 A
16 A
32 A
Input voltage
230 V
230 V
400 V
400 V
Power supply terminal block max section
(4)
10 mm2
10 mm2
10 mm2
10 mm2
RCD protection at panel according to IEC 61851-1:2017
(5)
30 mA type A
30 mA type A
30 mA type A
30 mA type A
Circuit breaker at panel
20 A
40 A
20 A
40 A
(4)
Rigid wires are recommended for the power supply. These cross sections must be re-assessed by professional and
qualified personnel depending on the length of the wires.
(5)
Always refer to your local installation regulations.