14
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN January 2022 www.eaton.com
00 Title
Figure 5 . The Green Motion Building EV charger drilling template on wall
Tag
Description
1
Hole
2
Floor
190.5 mm (7.5 inch)
206 mm (8.1 inch)
1500 mm (59 inch)
1
1
1
1
2