12
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN January 2022 www.eaton.com
00 Title
4.4 Lifting, transportation and unloading instructions
4.5 Unpacking
Transportation and handling
Transportation of the equipment, especially on the road, must be carried out in such a way as to protect the system
components (especially electronic components) from major impacts, humidity, vibrations, etc.
During handling, sudden or fast movements that could cause the system to sway dangerously must be avoided.
Remember that the packaging elements (cardboard, cellophane, staples, adhesive tape, straps, etc.) can
cause cuts and/or injuries, if not handled with care. They must be removed with appropriate tools and must
not be handled by non-responsible people (i.e. children).
The packaging components must be removed and disposed of in accordance with the local regulations and
laws of the country of installation.
Check the integrity of the packaging before opening.
Open the packaging and remove the Green Motion Building EV charger carefully to avoid damaging the
external casing or the internal electronic parts.
Before commissioning, ensure that the external casing of the Green Motion Building EV charger is in good
condition and free from damage sustained during transportation.
Do not underestimate the weight of the Green Motion Building EV charger; check the technical
specifications.
Do not move or stop the hanging load above people or things.
Do not let it drop with too much force.
Lifting
Eaton packs and protects each component by using devices that ease its transportation and handling. These operations
must be carried out by professional and qualified personnel specialized in loading and unloading components.
The ropes and vehicles used for lifting must be able to withstand the weight of the equipment. Do not lift multiple units
or parts of the equipment at the same time, unless otherwise advised. The Green Motion Building EV charger is not
equipped with specific lifting tools.