6 Assembly and installation of the DualGuard-S
CAUTION!!
Always dispose of packaging materials in an environmentally
friendly manner and in accordance with the applicable local
disposal regulations. If necessary, commission a recycling
company.
Observe the handling instructions on the packaging!
5.3 Storage
Packages must be closed until assembly and stored in
accordance with the installation and storage markings on
the outside.
Packages should only be stored ander the following condi-
tions:
• Do not store outdoors
• Dry and dust-free storage
• The storage location should be clean and tidy.
• The storage time should be as short as possible in the
interest of the user (FIFO method).
• The stacking of pallets or equipment is not permitted.
6 Assembly and installation of the DualGu-
ard-S
WARNING! DANGER OF INJURY!
Improper installation and installation can lead to serious per-
sonal injury and/or damage to property. This work may there-
fore only be carried out by authorised, instructed personnel
familiar with the operation of the device and in compliance
with all safety regulations.
• Ensure sufficient freedom of movement.
• Pay attention to cleanliness and order at the workplace. Loo-
se or loose components and tools are sources of accidents!
• Ensure sufficient cooling of the system
• Observe ambient conditions in accordance with protec-
tion Typee and class (with regard to protection against
contact with live parts and ingress of dust, foreign bodies
or moisture).
• The cable length in a lighting circuit up to the last luminaire
in the circuit must not exceed the permissible cable length.
Special requirements for distributors with functional
integrity Typee DualGuard-S ESF... :
The enclosures must be adapted to the masonry in such a
way that the enclosures are horizontal. The masonry must
be designed to withstand fire for at least 30 minutes. The
fire resistance period of the masonry must not be affected
by the installation.
The systems illustrated in these installation and operating
instructions may differ in their modular configuration when
delivered. Special features of customer-specific designs are
described in the project documents to be ordered separately.
WARNING!
Work on the general supply network and the laying of load,
signal and control lines as well as the connection of the
battery power supply may only be carried out by qualified
electricians with special knowledge of the legal and technical
principles for the installation and operation of emergency
lighting systems. This also applies to the initial commissioning
or re-commissioning of the emergency lighting system or the
DualGuard-S system.
Take all necessary measures for occupational safety!
In addition to compliance with general technical standards
and procedures, this includes, in particular, compliance with
all special notes and instructions.
NOTE!
All connecting cables may only be laid in accordance with
the relevant electrical engineering directives and standards
(e.g. DIN VDE 100 series of standards).
In addition, observe all national directives and regulations of
the country in which the system is installed and operated.
Secure all cable inlets and outlets of the DualGuard-S cabi-
net against mechanical damage to the cables or moisture
ingress using the M cable glands or rubber seals provided
for this purpose.