Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 68. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown)
Plug Retainer
1
2
3
44..1155
S
Siinnggllee P
Paarraalllleell R
Reeaaddyy U
UP
PS
S IInnssttaallllaattiioonn
CAUTION
Only qualified service personnel (such as a licensed electrician) shall perform the electrical installation. Risk of
electrical shock.
NOTE
Do not make unauthorized changes to the UPSs; otherwise, damage may occur to your
equipment and void your warranty.
To install one UPS in a parallel-ready configuration:
1.
Verify that the UPS is installed in a rail kit in a rack containing a BladeUPS Bar.
2.
Switch off utility power to the distribution point where the parallel-ready UPS system will be connected.
Be absolutely sure there is no power.
3.
Verify that all circuit breakers are in the OFF (O) position.
Содержание BladeUPS none
Страница 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Страница 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Страница 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Страница 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Страница 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Страница 160: ...16420164914 164201649 14 ...