5.1  Introduction

The ATC-800 is fully programmable from the device’s faceplate or 

through the communications port. Users can reprogram setpoints 

as well as other parameters. The time and date can be changed 

while the device is in either the Run Mode or the Program Mode. 

Setpoints, however, can only be changed while the device is in 

the Program Mode.

5.2  Entering and Exiting the Program Mode

 

To enter the Program Mode, move the Run/Program Toggle 

Switch located on the right rear chassis to the Program position. 

Once the Program Mode is activated, the Program LED blinks red 

and continues until the Program Mode is exited. 
When programming changes have been completed, the Program 

Mode is exited by moving the Run/Program Toggle Switch back to 

the Run position. At that point, the Automatic LED continues to 

blink green, the alphanumeric display shows the word “Program” 

for a short period, and the Program LED will no longer be illumi-

nated. It is also at that point when any setpoint changes are saved 

in the device’s non-volatile memory.

5.3  Programming Procedures

Once the Program Mode has been entered, use the Display Select 

Pushbutton to move to the Setpoints Display. The Setpoints LED 

will be lit red and the first programming possibility will appear in 

the display. Use the Step Pushbutton to move from one feature 

setpoint to another, stopping at those in need of reprogramming. 

Use the Increase or Decrease Pushbuttons to move the display to 

a new setpoint selection. Once a new setpoint selection has been 

made, move to the next feature in need of change. Once all set-

points are displayed as required, exit the Program Mode and the 

new setpoints are automatically stored.

5.4  Programmable Features/Setpoints 

All ATC-800 programmable features and associated setpoint pos-

sibilities with any required explanations are presented in Table 

2

Remember, only features originally ordered and factory pro-

grammed will appear in the display.

NOTICE

ALTHOUGH ALL ATC-800 PROGRAMMABLE FEATURES ARE 

ADDRESSED IN THIS SECTION, ONLY THOSE ORDERED BY THE 

CUSTOMER AND INITIALLY PROGRAMMED AT THE FACTORY WILL 

APPEAR IN THE DISPLAY FOR PROGRAMMING CHANGES IN THE 

FIELD.

NOTICE

WHILE IN THE PROGRAM MODE, ATC-800 IS NEVER OFF-LINE AND 

CONTINUES TO FUNCTION IN ACCORDANCE WITH PREVIOUSLY 

PROGRAMMED SETPOINTS.

NOTICE

IF NO PUSHBUTTON ACTIVITY IS DETECTED FOR APPROXIMATELY 

2 1/2 MINUTES WHILE IN THE PROGRAM MODE, THE SETPOINTS 

LED IS CLEARED AND THE ALPHA-NUMERIC DISPLAY IS BLANKED. 

ANY PREVIOUSLY MADE SETPOINT CHANGES ARE NOT SAVED, 

SHOULD THIS OCCUR.

NOTICE

WHEN THE TOGGLE SWITCH IS IN THE PROGRAM POSITION, 

REMOTE COMMUNICATIONS PROGRAMMING IS INHIBITED.

NOTICE

CHANGING THE SYSTEM NOMINAL VOLTAGE OR FREQUENCY SET-

POINTS WILL AUTOMATICALLY CHANGE ALL THE PICKUP AND 

DROPOUT SETTINGS TO NEW DEFAULT VALUES.

Содержание ATC-800

Страница 1: ...roller Instructional Booklet Description Page 1 Introduction 2 2 Hardware Description 7 3 Operator Panel 11 4 Operation 14 5 Programming 20 6 Troubleshooting and Maintenance 23 Appendix A Status Displ...

Страница 2: ...al or conse quential damage or loss whatsoever including but not limited to damage or loss of use of equipment plant or power system cost of capital loss of power additional expenses in the use of exi...

Страница 3: ...from most system voltages available worldwide at 50 or 60 Hertz In addition a period of no control power operation is provided ATC 800 moni tors the condition of the 3 phase line to line voltage and...

Страница 4: ...ce is already available the TDES timer is bypassed Standard Feature 3 Time Delay Emergency to Normal TDEN TDEN delays the transfer to the Normal Source to permit stabiliza tion of the Normal power sou...

Страница 5: ...ual to or above the pickup setting to become available again Underfrequency Monitoring for Source 1 1UFD 1UFP This feature constantly monitors Source 1 for an underfrequency condition When the Source...

Страница 6: ...time delay in the transfer switch Neutral position when both breakers are open This delay takes place when the load is transferred in either direction to prevent excessive in rush currents due to out...

Страница 7: ...Modbus compatible devices A separately mounted communications mod ule will enable the automatic transfer controller to be remotely monitored controlled and programmed via the network Optional Feature...

Страница 8: ...ssages 5 Display LEDs seven LEDs to identify the Display Win dow Information 6 Help Pushbutton provides English language help information in any operational mode 7 Increase Decrease Pushbuttons used i...

Страница 9: ...e communication module PONI to the back of the ATC 800 Figure 3 or in a remote location Since the ATC 800 is always supplied with a communications port a PONI can be easily retrofitted to the ATC 800...

Страница 10: ...kup Range Volts Breaker Switch Style ATS Contactor Style ATS Dropout 2 to 99 of Nominal System Voltage Dropout 2 to 99 of Nominal System Voltage Overvoltage Dropout Range Volts Breaker Switch Style AT...

Страница 11: ...Source 1 is the preferred source choice Source 1 Connected Status LED This LED is lit green if Source 1 is connected This is accom plished by sensing the Source 1 breaker via the S1 closed auxil iary...

Страница 12: ...sfer will occur and the engine will run for the programmed run time 3 3 4 Display Select Pushbutton As the Display Select Pushbutton is pressed and released ATC 800 steps through the following display...

Страница 13: ...le conditions will be shown OVER V The source has risen above the dropout setting and not dropped below the pickup setting UNDER V The source has dropped below the dropout setting and not risen above...

Страница 14: ...ated by the features supplied and their programmed setpoint values It provides a sum mary of ATC 800 s intelligence and supervisory circuits which constantly monitor the condition of both normal and e...

Страница 15: ...g this contact will activate the Emergency Inhibit input If the Emergency Inhibit contact is opened when the load is con nected to the Normal Source no action will be taken if the Normal Source is ava...

Страница 16: ...able up to 10 separate loads The Addressable Relay II must be set for 1200 BAUD rate WATCHDOG feature disabled RELAY PULSE feature disabled Address range from 002 to 00B Under normal condition with so...

Страница 17: ...itions include improper circuit breaker operation motor operator failure and unsuccessful closed or in phase transition An alarm may be reset by simultane ously pressing the Increase and Decrease Push...

Страница 18: ...the TDNE countdown the Emergency Source goes unavailable more than three times Each time TDNE will restart 4 If the Emergency Source is powering the load and it goes unavailable for more than the TDEF...

Страница 19: ...ransition require that both sources be available and synchronized in voltage frequency and phase The frequency difference must be less than the closed transition fre quency difference set point 0 0 to...

Страница 20: ...The Setpoints LED will be lit red and the first programming possibility will appear in the display Use the Step Pushbutton to move from one feature setpoint to another stopping at those in need of rep...

Страница 21: ...ltage1 115 110 Volts 1OVP Source 1 Overvoltage Pickup Volts Breaker Switch Style ATS Contactor Style ATS 103 to Dropout 2 of Nominal System Voltage1 103 to Dropout 2 of Nominal System Voltage1 110 105...

Страница 22: ...ser Minute 0 to 59 Minutes 0 Minutes MANTR Re Transfer Mode 0 Automatic 1 PB Return 0 CTDNE Commitment to Transfer in TDNE 0 Not Committed 1 Committed 0 TMODE Engine Test With Without Load Transfer 0...

Страница 23: ...nutes of inactivity with pushbuttons when changing set points Voltage dropout and pickup setpoints are different than what was programmed Adjusted nominal voltage setpoint Re adjust all dropout and pi...

Страница 24: ...open when Source 1 contactor opened S1 Aux Close contacts did not close when Source 1 Contactor closed Check Source 1 contactor trip wiring Press Increase and Decrease push buttons simultaneously to c...

Страница 25: ...ts Determine the cause and rectify if possible Replace defective com ponents after the cause is determined Step 5 Press the push to close button on the normal switching device Verify whether or not th...

Страница 26: ...the correct line voltage and frequency available at ter minals E1 E2 and E3 Record the readings If YES Proceed to Step 3 If NO Verify that there is output voltage from the generator Step 3 Is the volt...

Страница 27: ...e ATC 800 are de energized These may also be present on some of the terminal blocks Step 3 Before disconnecting any wires from the unit make sure they are individually identified to assure that reconn...

Страница 28: ...Waiting for load voltage to decay before completing the transfer TDP Countdown timing while waiting for a pre transfer acknowledge input TSEQ Countdown timing between sequenced loads NO R xx No commun...

Страница 29: ...Source 2 Connected Time This counter logs time in hours whenever Source 2 is connected to the load Time will start being logged at the time the S2 AUX control input is closed This counter will count u...

Страница 30: ...erator 7 Engine test 8 Manual re transfer 9 Engine Test via communications 10 Go to neutral 11 Program mode 12 Options or setpoints error 13 Emergency Inhibit 14 Go to Emergency 15 Lock out 16 Failed...

Страница 31: ...sly roll over between AM and PM values Minutes By using the Increase or Decrease Pushbuttons the minutes of the day can be adjusted to the present value The number will continuously roll over between...

Страница 32: ...For 1 Phase Sensing with Open Transition FREQ Condition VOLT FREQ Condition VAB VBC VCA FREQ Condition VOLT FREQ Condition Display is blank or a status message appears Note All menu items are not nece...

Страница 33: ...D 2UFD 1UFP 2UFP 1OFD 2OFD 1OFP 2OFP TDN TDNLD LDCY PRF SRC EXER EXLD PEDAY PEH PEMIN MANTR CTDNE TMODE TER TPRE GENNO PHASE TSEQ STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP...

Страница 34: ...breaker Momentarily energize K3 Source 1 becomes unavailable or Engine Test Plant Exerciser Go To Emergency TDES timer times out Send Engine Start signal Energize Gen Start relay TDNE timer times out...

Страница 35: ...eaker Momentarily energize K3 Source 1 becomes unavailable or Go To Emergency TDNE timer times out Open Source 1 breaker Energize K2 Y Source 2 is powering the load Close Source 1 breaker Momentarily...

Страница 36: ...signal Energize Gen Start relay TDNE timer times out Y Source 2 is powering the load Energize Alarm relay Open Source 1 Energize K2 Close Source 2 out of Sync Momentarily energize K4 Source 1 is powe...

Страница 37: ...tion visit www eaton com Instructional Booklet Effective March 2012 Page 37 Instructions for Installation Operation and Maintenance of the Eaton ATC 800 Closed Open Transition Transfer Switch Controll...

Страница 38: ...let Page 38 Effective March 2012 Instructions for Installation Operation and Maintenance of the Eaton ATC 800 Closed Open Transition Transfer Switch Controller For more information visit www eaton com...

Страница 39: ...re information visit www eaton com Instructional Booklet Effective March 2012 Page 39 Instructions for Installation Operation and Maintenance of the Eaton ATC 800 Closed Open Transition Transfer Switc...

Страница 40: ...DEALING OR USAGE OF TRADE ARE MADE REGARDING THE INFORMATION RECOMMENDATIONS AND DESCRIPTIONS CONTAINED HEREIN In no event will Eaton be responsible to the purchaser or user in contract in tort inclu...

Отзывы: