Installation, Operation and Parts Manual
EE-6214EKZ
19
Step 10: Install lifting arms.
Connect the lifting arm and the carriage. The arm pin shafts (No. 2) must be greased at the installation
Install the lifting arms onto the carriages and ensure the arm lock could work.
Attention: Install Lifting arms and fix feet protection bars ONLY after the complete assembly has been erected and anchored.
Step 11: Fill with hydraulic oil.
CLEAN AND FRESH OIL ONLY. DON’T FILL THE TANK COMPLETELY FULL.
Lift must be fully lowered before changing or adding hydraulic oil.
Prepare 13 liters of hydraulic oil. The level of oil shall reach the tippets volume mark of the tank. Add more oil after running the lift for
several cycles until the lift can rise to the maximum lifting height.
It is recommended to use HM No.46 hydraulic oil. Use HM No.32 hydraulic oil when average temperature of the location is below 10 degree
Celsius.
Change the oil 6 months after initial use and change once per year thereafter.
Step 12: Trial running.
Get familiar with lift controls by running the lift through a few cycles before loadi ng vehicle on lift.
This step is of particular
importance for it can check if the oil hoses are well connected. The connection is qualified when there is no abnormal sound or leakage after
having been tested for 5-6 cycles.
Bleeding the hydraulic system
Unscrew but don't remove the nut on top of the oil cylinder and slightly press the UP button until oil gets out. Screw the nut tight thereafter.
After bleeding, oil level in power unit reservoir may be down. Raise and lower lift several cycles. Add more oil if necessary to raise lift to full
height. It is only necessary to add oil to raise lift to full height.
Check the mechanical safety locking unit.
Check if its safety locking plates can be effectively engaged or released in the running process.
Adjust by screwing the screw as showed in the following drawing in case they cannot engage or disengage simultaneously
Check the synchronization of both lifting carriages.
Ensure the
synchronization
by adjusting the balance steel cables at both sides. Make both cables be of the same tightness.
This could be judged by the sound emitted by the safety
locking unit
during lifting process.
1.Carriage
2.Arm pin shaft
3.Arm
4.Handle of arm lock
5.Arm lock unit
Vent air remained in the cylinder
Содержание EE-6214EKZ
Страница 10: ...Installation Operation and Parts Manual EE 6214EKZ 10 3 4 Dimensions...
Страница 27: ...Installation Operation and Parts Manual EE 6214EKZ 27 Annex 2 Electrical schemes and parts list...
Страница 28: ...Installation Operation and Parts Manual EE 6214EKZ 28...
Страница 29: ...Installation Operation and Parts Manual EE 6214EKZ 29...