Annex 1, Floor plan
Indoor installation only.
There must also be a clearance of at least 1 meter between the lifting platform and fixed elements (e.g. wall) in all
lifting positions. There must be sufficient space for driving vehicles on and off.
C25 concrete base with a minimum thickness of 200mm.
Surface under base of the post: Horizontal and even (Gradients max. 0.5 %)
Newly built concrete ground must be older than 20days.
In mm.