INSTALLATION INSTRUCTIONS
4.1 Preparations before installation
4.1.1 Space requirements.
Indoor installation only.
Refer to 3.4 for the dimensions of the lift. There must also be a clearance of at least 1 meter between the
lifting platform and fixed elements (e.g. wall) in all lifting positions. There must be sufficient space for driving vehicles on and off.
4.1.2 Foundations and connections
The user must have the following work performed before erecting the lift.
Construction of the foundation following consultation with the manufacturer’s customer service or an authorized service agent.
Routing of the wiring to the installation location. The user must provide fuse protection for the connection.
Electrical system
connection must be done by a qualified electrician.
Requirements for power supply cable of the installation site: at least 2.5mm
2
wire
core for 3Ph power and 4.0mm
2
wire core for 1Ph power.
Refer also to the corresponding information on the name plate and in the operation instructions. Before doing electrical connection,
make sure the lift is electrically adapt to the local power supply.
Foundations preparations (see Annex 1, floor plan)
To ensure stability and safety under load, the lift shall be installed with the base frame being in direct and firm contact with the concrete
foundation. Don't attempt to fix the base frame directly onto floor with ceramic and other decorated surfaces otherwise you put the lift
into a very dangerous situation.
C25 concrete foundation with a minimum thickness of 200mm.
Surface under base of the post: Horizontal and even (Gradients max. 0.5 %).
Newly built concrete ground must be older than 20days.
4.1.4 Tools and equipment needed for installation
Tool name
Specification
Quantity needed
Electrical drill
With D18 drill bit.
1
Open spanner
D17-19mm
2
Adjustable spanner
bigger than D30mm
1
Cross socket screw driver
PH2
1
Quick spanner handle adapter/ Ratchet
REB-310
1
Socket spanner
D24mm
1
Levelling device
1mm accuracy
1
Hammer
10 pounds
1
Truck lift
Capacity more than1000 kg
1
Lifting string
Capacity, 1000 kg
2
Torque spanner
MD400
1
Содержание EE-6214EKZ
Страница 10: ...Installation Operation and Parts Manual EE 6214EKZ 10 3 4 Dimensions...
Страница 27: ...Installation Operation and Parts Manual EE 6214EKZ 27 Annex 2 Electrical schemes and parts list...
Страница 28: ...Installation Operation and Parts Manual EE 6214EKZ 28...
Страница 29: ...Installation Operation and Parts Manual EE 6214EKZ 29...