Installation, Operation and Parts Manual
EE-6214EKZ
16
Step 9: Connect electrical system.
Refer to electrical connection diagram before making the connection.
Attention: electrical system connection must be done by qualified electricians.
1.
Fix the operation unit onto the main post.
2. Fix max height limit switch onto the inside surface of the main post and connect its wire with the corresponding wire comes from the
control box by quick electrical connector.
1. Control box
2. Hex socket screw M6*15
3. Power side post
1. Max height limit switch TZ8108
2. Cross socket cap head screw M4x12
3. Cross socket cap head screw M4x25
4. Quick electrical connector
Содержание EE-6214EKZ
Страница 10: ...Installation Operation and Parts Manual EE 6214EKZ 10 3 4 Dimensions...
Страница 27: ...Installation Operation and Parts Manual EE 6214EKZ 27 Annex 2 Electrical schemes and parts list...
Страница 28: ...Installation Operation and Parts Manual EE 6214EKZ 28...
Страница 29: ...Installation Operation and Parts Manual EE 6214EKZ 29...