4 Replacement Procedures 4.12 LCD Panel
Maintenance Manual Satellite Pro E10-S / dynabook E10-S 4-20
Installing
LCD Panel
Install LCD Panel according to the following procedures and Figures 4-12
1.
Install the easy pull adhesive to the corresponding position
2.
Insert LCD cables in parallel and arrange them in order
3.
Fix the LCD panel to the corresponding position
4.
Install the six shaft screws CM2.0X5.5X
φ
4.0X0.5
5.
Install two screws to fix the LCD panel CM2.0X2.0X
φ
4.0X0.5
6.
Pay attention to adjust the LCD and cable
7.
Install the B cover
Содержание E10-S
Страница 1: ...1 i 1 Chapter 1 Hardware Overview...
Страница 16: ...2 Chapter 2 Troubleshooting...
Страница 47: ...Chapter 3 Diagnostic Programs...
Страница 50: ......
Страница 64: ......
Страница 89: ...5 Appendix 3 Diagnostic Programs 3 41 Maintenance Manual Satellite Pro E10 S dynabook E10 S...
Страница 92: ......
Страница 96: ......
Страница 102: ......
Страница 104: ......
Страница 110: ...4 Replacement Procedures 4 Chapter 4 Replacement Procedures...