© 2006 Carlo Gavazzi Industri A/S. All rights reserved
73
G 3800 X036 Operation Manual
August 2006
Object
Function
Channel
In-/outputs
Push-button inputs
Local activation
A1..B4
C1..D4
Push-button inputs
Group-wise
B5/6
Master
D5/6
D7/8
Binary inputs for
Priority control
E1/E2
wind/rain sensors
Relay outputs
Motors
A1..B4
Configuration
Decentralized
Roller blind/roof
A1.. B4
Roller Blind Up-Down
window control
C1..D4
Roller Blind Master
Group-wise control B5/6
ground floor
Roller Blind Master
Group-wise control
D5/6
1st floor
Roller Blind Master
Master control
D7/8
Push-button function
Connection of
E1/E2
With the logic setup below, the rain sensor activates all roller blinds in the Down-direction through the master
function. If the wind sensor channel is set, the command of the decentralized up-down control is not executed
(priority control at each decentral roller blind object).
Output
Input 1
Function
Input 2
D8
/E2
AND
/E2
Application Example
Task:
Control of several roller blinds as well as a roof window in a building. The system should include
groupwise control for two different floors as well as master control of all roller blinds together.
To protect the roller blinds, a wind sensor and a rain sensor are installed. The roller blinds are to
roll down by rain and up by wind, and wind has priority. The roof window is to close by rain.
Solution:
The roller blinds as well as the roof window are activated through Dupline roller blind control
modules. For the group-wise and the master control, roller blind master controls are used. The
address of the wind sensor is marked directly in the roller blind controls as priority address. The
down-channel of the master control is activated through logic setup via the address of the rain
sensor. Further details can be found in chapter 2.5.2.