background image

18

motor cables, taking care not to damage the support of the brush holder blades. 

drawing 3.3.

4) ENGINE ASSEMBLY

(See the drawings in section 4).

The surface on which the engine will be fixed to the ground must be perfectly smooth 

and flat. It is advisable to arrange a higher floor from the ground to avoid possible 

water infiltration in case of cold. It is also advisable to add the optional plate Ref. 

PLAK7800, which allows a better adjustment of the final position of the motor with re-

spect to the rack. This optional accessory facilitates the correction of the position that 

may be necessary over time or in relation to the change of season due to the expan-

sion of the materials in relation to the temperature.

The height of the surface where the motor is to be fixed must also be studied in rela-

tion to the position of the frame that will be installed on the gate.

After having determined the ideal mounting position of the motor and its height with 

respect to the frame, fix the motor directly to the ground using screws suitable for the 

type of floor (not included). Drawings 41-4.2.

In case of using the additional plate Ref. PLAK8700, fix the plate to the ground and 

then fix the motor to the plate using the supplied screws that allow you to adjust the 

exact final position with respect to the rack. It is recommended to use screws to posi-

tion the motor in the high position. Figure 4.3.

Over time, the progress of the structure tends to decrease. It will then be possible to 

adapt the motor correction downwards.

5) MANUAL EMERGENCY RELEASE

(See the drawings in section 5).

The key release system allows the gate to be operated manually.

Two release keys are provided.

Turn the key clockwise, pull the knob towards you. The gate can now be moved ma-

nually.

To re-lock the engine, close the release knob, turn the key counterclockwise, and 

remove the key in the vertical position. drawing 5.1.

Note: the release system is only accessible from inside the property. It is recommen-

ded that you make sure you have secondary access.

DUCATI

 

INSTALLATION    

         WARNING

:

 

The gate must be equipped with mechanical stops that prevent the 

gate from derailing, causing a risk of serious danger to the life of people or things.

WARNING

: I

n the absence of a mechanical stop, do not automate or manually operate the 

gate. Call a specialist right away to bring the facility to a standard level. The manufacturer 

declines all responsibility for damage caused by improper installation of unsuitable or 

dangerous structures.

PREPARATIONS BEFORE INSTALLATION

Motorization operated by a high voltage sector: A certified electrician must prepare 

the 230V 50Hz (or 110V 60H) power supply line with cable outlet at the point where 

the motor will be earthed (procedure not necessary in case of motorization from solar 

panel).

The surface on which the engine will be fixed to the ground must be perfectly smooth 

and flat. It is advisable to arrange a higher floor from the ground to avoid possible 

water infiltration, for example a masonry, concrete or iron base. It is also advisable to 

add the plate Ref. PLAK 7800 as an option, which allows a better adjustment of the 

final position of the motor with respect to the rack. This optional accessory facilitates 

the correction of the position that may be necessary over time or in relation to the 

change of season due to the expansion of the materials in relation to the temperature.

The height of the surface where the motor is to be fixed must also be studied in rela-

tion to the position of the frame that will be installed on the gate.

Prepare sheaths for the passage of the accessory connection cables (flashing light, 

key selector and possible set of photocells, external receiver).

3) ENGINE POSITIONING: RIGHT OR LEFT   

(See the drawings in section 3, page 6).

The motor must be installed parallel to the gate. Inside the property at the level of the 

column corresponding to the side on which the gate opens.

It is important to calculate the mounting position of the motor over the distances indi-

cated within the limits of drawing 4.2, on page 6.0.

MOTOR CABLE CONNECTION

 depending on the direction of movement of the gate: 

gate that opens to the right or opens to the left (seen from inside the property).

The motor is designed for a STANDARD opening of the gate on the right (seen from 

inside the property). Illustration 3.2.

If the gate opens to the left it is necessary to reverse the polarity of the red and blue 

Содержание SLIDE 1043/24V

Страница 1: ...ronic board CTH43V 24V SLIDE 1043 24V Motor 24V electronic board CTH43V 24V SLIDE 446 SOLAR SOLAR Motor 12V electronic board CTH46 SLIDE 743 12V SOLAR SOLAR Motor 12V electronic board CTH43V 12V https...

Страница 2: ...12V KIT SOLAR SLIDE 743 with gearmotor model SLIDE MOT 700V 12V FAST KIT SLIDE 843 24V with gearmo tor model SLIDE MOT 800V 12V FAST KIT SLIDE 1043 24V with gearmotor model SLIDE MOT 1000V 12V FAST S...

Страница 3: ...ry to add the battery charger module Ref CMBAT optional accessory Warning use 2 12V batteries in series If only a 12V buffer battery is used it can be housed in the engine block but the engine will on...

Страница 4: ...ate 17 6 1 6 6 page 7 Temporary positioning of the limit switches 17 7 1 7 2 8 1 8 3 page 8 Power supply by 230V switch or solar panel 18 9a 9b page 9 Remote sending storage of the 1st maneuver 18 19...

Страница 5: ...lecteur cl J Clavier code sans fil en option Rail But e m canique de votre portail Orientation Sud Guide Wall Wall D 19 cm 34 cm 23 cm 1 1 DUCATI INSTALLATION DIAGRAM AND MOTOR DIMENSIONS orientaci n...

Страница 6: ...Left opening Red Blue Blue Red Direct fixing to the ground DUCATI DRAWING FOR QUICK INSTALLATION PLAK 8700 fixing plate optional Attention adjust the position of the motor on the plate to the maximum...

Страница 7: ...unlock s Place the rack on the gear one piece at a time Fix the rack piece by piece passing the same di stance from the gear the rack must always be at the same distance from the gear without major fr...

Страница 8: ...it switch Gate open limit switch M Magnet R Magnetic detector S1 Mechanical stop gate closed S2 Open gate mechanical stop Temporary adjustment of the limit switch magnets Mechanical limit switch Mecha...

Страница 9: ...powered by transformer BLACK cable YELLOW cable Boards in 24V ver sion powered by transformer BLACK cable RED cable Battery 12V min 7A Board CTH46 solar panel power supply Board CTH43V in 12V ver sio...

Страница 10: ...gnet R Reed sensor S1 Mechanical stop end limits in closed position S2 Mechanical stop end limits in open position to block To unlock Manually open the gate halfway Closed gate Press and release butto...

Страница 11: ...battery rechar ging system WARNING photocell jumper between terminals 7 and 8 Remove only the jumper when connecting a set of photocells WARNING emergency stop jumper between terminal block no 6 and...

Страница 12: ...CTH43 12V CMBAT 12V min 7A 12V min 7A CTH43 12V Radio receiver external Ref RX43 optional Radio receiver Red 24 V Yellow 12V Setting the starting point of deceleration SOFT STOP Move right to activat...

Страница 13: ...e starting point of deceleration SOFT STOP Move right to activate the settings return the switch to the left after completing the setting press P1 to delay the beginning of the slowdown press P2 to an...

Страница 14: ...TOP Setting the starting point of deceleration SOFT STOP Move right to activate the settings return the switch to the left after completing the setting press P1 to delay the beginning of the slowdown...

Страница 15: ...lock no 4 and 5 Remove the jumper only when connecting an emergency stop switch WARNING Be careful when connecting the optional battery charger Modul Ref CMBAT respect the polarity of the connections...

Страница 16: ...system or in the gate neither during nor after the installation of the drive to prevent these objects or components of the structure itself from being trapped This could cause serious injury or even...

Страница 17: ...the gate has stopped Activate the gate only if you can keep a visual check and you have verified that there are no people objects or animals in the maneuvering area Maintenance Perform regular mainte...

Страница 18: ...revent the gate from derailing causing a risk of serious danger to the life of people or things WARNING In the absence of a mechanical stop do not automate or manually operate the gate Call a speciali...

Страница 19: ...output pinion is constant over the entire length of the gate The rack must be fixed to the gate with self drilling stainless steel screws not inclu ded Assemble the rack parts using the male female r...

Страница 20: ...p left memorized by the manufacturer for the total maneuver cycle NOTE The motorization can be powered by one of the two versions of magnets MAGNO 001 or MAGNO 003 see drawings in section 7 The motori...

Страница 21: ...See diagram 14 for the CTH46 board and diagram 16 for the CTH43V 24 board Each button on the remote control corresponds to a broadcast channel The button to be used to control the motor must be store...

Страница 22: ...e contact is open the gate will not work at all until the contact closes WARNING Terminal blocks 7 8 are connected by an electric bridge to keep the photocell con tact closed Remove the bridge only if...

Страница 23: ...e sequence open stop close To set this operating mode turn the TIME knob fully counterclockwi se TIMED AUTOMATIC CLOSING mode 1 100 seconds Each remote control pulse corresponds to a complete maneuver...

Страница 24: ...will only take effect in the next cycle ELECTRONIC BOARD CTH43 Attention there are 3 versions of this board a CTH43N 12V version b CTH43V 12V version with SOFT STOP c CTH43V 24V version with SOFT STOP...

Страница 25: ...s to slow down long before recogni zing the limit switch magnet WARNING The exact adjustment of the slowdown is particularly important in the case of very heavy and or very sliding gates to manage the...

Страница 26: ...emorizes a button to command a complete maneuver cycle On the electronic board press the P1 key The red LED light turns on Release the P1 key Press the button on the remote control hold it down for a...

Страница 27: ...ON CHANNEL ON THE ELECTRONIC MOTOR BOARD On the electronic board press the P1 button to command a complete maneuver cycle or P2 on the CTH43 board and CTH46 board to command a partial pedestrian openi...

Страница 28: ...ction replace the cover on the key switch and screw the plug Electrical connection 1 Connect the two wires of the power cable to the screw terminals Diagram 4 2 Close the box diagram 2 3 Pull the cabl...

Страница 29: ...efine the position of the flashing light and then locate the punch positions 5 Plan for cable routing 6 Secure the flashing light with screws and plugs not included 7 Screw in the bulb supplied and th...

Страница 30: ...ent of the infrared ray is re established and the contact is closed Use of photocells as an opening control system Power the photocells and connect the NO contact normally open to the START contact of...

Страница 31: ...tenance relocation reinstallation of a repaired or replaced unit b Parts subject to wear such as fuses cells batteries carbon brushes light bulbs etc They are never included in the warranty c Transpor...

Страница 32: ...eristics or components of its products without notice Register on our website to receive numerous offers on other accessories and other products in our range Our commitments Support you in improving y...

Страница 33: ...33 Register in www ducatihome it VIDEO NOTICES PROMO INDEPENDENT PIECES SUPPORT 7 24h ADVICE...

Страница 34: ...utomazione cancelli via Cassani 43036 Fidenza PR ITALY Phone 39 0524 527967 Phone 39 0524 591085 Phone 0039 335 1022019 info ducatihome it REGISTER ON OUR SITE www ducatihome it TO BENEFIT FROM MANY O...

Отзывы: