![Dover Anthony Complete 101 Series Скачать руководство пользователя страница 67](http://html1.mh-extra.com/html/dover/anthony-complete-101-series/anthony-complete-101-series_installation-manual_2524816067.webp)
Complete 101 Series Installation Manual
99-25517-I001 July 2022 Rev. B
66 |
P a g e w w w . a n t h o n y i n t l . c o m
Section 17 – Pass-Thru Frame and Door Installation
Tools Required
The following is a list of all the different equipment, tools, materials, and other things you will need when installing the Anthony 103 Pass-
Thru Frame and Doors.
Equipment:
Frame Installation:
Tools:
Materials:
•
Safe movers
•
Dollies
•
Ratchet straps
•
Clamps
•
Narrow pallet jack
•
J-bar
•
Broom
•
Shims
•
Silicone/Butyl
•
Caulk gun
•
4' - 6' level
•
Rubber/plastic mallet
•
Wire stripper/cutter
•
Wire nuts
•
Tape measure
•
Towels / rags
•
Voltage tester
•
Soldering Iron
•
#2 Philips screwdriver
•
Flat-head screwdriver
•
Needle-nose pliers
•
Razor Knife
•
Utility knife
•
5/32” Hex Key
•
7/16 & 1/2" wrenches
•
Wireless Drill/Driver
•
Dielectric grease
(Anthony P/N: 98-25497-
0001)
•
NSF Approved Silicone Sealant
•
Plywood Shims
•
Foam glass cleaner (Ammonia
Free)
•
Black Paint marker
PROTECTIVE GEAR NOTICE
Protective Eyewear– Potential risk of eye injuries, protective eyewear required when
performing this, and any other associated tasks.
Protective Gloves– Potential risk of injury to your hands, protective gloves required when
performing this, and any other associated tasks.
Footwear Protective – Potential risk of injury to your feet, wearing protective footwear is
required when performing this and any other associated tasks.