After Installation Gasket Check
After installation is completed, ensure that all door gaskets are securely installed for optimal sealing performance. When handing the door
during installation gaskets can be pulled out of place.
1.
Use your hands and fingers to check the entire perimeter of the door and the gasket.
2.
If any portion of the gasket is not correctly in place, press the gasket dart firmly back into place into the back plastic of the door. As
shown in Figure 4.6.
3.
Make sure to run your fingers a second time to ensure that the dart of the gasket is fully engaged into the grove of the back plastic
around the entire door parameter. As shown in Figure 4.6.
Figure 4.6: Checking Door Gaskets
Clean up Work Area
After installation is completed, ensure to dispose of any installation-related debris and trash. Remove any crates remaining in the shopping
area and/or any barriers set up.
Check door for Functionality
Refer to
“Section 5 - Required Functionality for Complete Install”