![DOMUSA TEKNIK MINNY Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/domusa-teknik/minny/minny_installation-and-operating-instructions-manual_2520203023.webp)
21
21
21
21
12
12
12
12
DRAINING THE BOILER
DRAINING THE BOILER
DRAINING THE BOILER
DRAINING THE BOILER
The water is drained from the boiler by opening the air drain valve
(1)
(1)
(1)
(1)
inside the boiler (on the lower
right hand side on opening the door). Connect a flexible tube to this valve and run it to a drain. After
draining the boiler, close the valve again and remove the flexible tube.
13
13
13
13
SWITCHING OFF THE BO
SWITCHING OFF THE BO
SWITCHING OFF THE BO
SWITCHING OFF THE BOILER
ILER
ILER
ILER
To switch off the boiler, place your finger on the power touch button
(15)
(15)
(15)
(15)
for 1 second. In
Off mode
Off mode
Off mode
Off mode
,
while the boiler is plugged into the mains and connected to the fuel installation, its heating and DHW
functions will be switched off but the anti-frost protection and pump anti-block functions will remain
activated.
To shut down the boiler functioning completely, unplug it from the mains and cut off the fuel supply.
14
14
14
14
FIRST STAR
FIRST STAR
FIRST STAR
FIRST START
TT
T----UP
UP
UP
UP
For the
guarantee
guarantee
guarantee
guarantee to be valid
to be valid
to be valid
to be valid
, the boiler must be started up for the first time by an
official DOMUSA
official DOMUSA
official DOMUSA
official DOMUSA
TEKNIK Technical Assi
TEKNIK Technical Assi
TEKNIK Technical Assi
TEKNIK Technical Assistance Service
stance Service
stance Service
stance Service
. Before beginning start-up, the following must be complied
with:
- The boiler must be electrically connected to the mains.
- The installation must be filled with water (1 - 1.5 bar must be indicated on the digital display).
- Fuel must be reaching the burner at a pressure of no more than 0.4 bar.
15
15
15
15
INSTALLATION DELIVER
INSTALLATION DELIVER
INSTALLATION DELIVER
INSTALLATION DELIVERY
Y
Y
Y
After the initial start-up, the Technical Assistance Service will explain to the user how the boiler
functions, making any observations they consider relevant.
The installer is responsible for clearly explaining to the user the functioning of any control or
regulation device forming part of the installation but not supplied with the boiler.