The maximum vertical length
The maximum vertical length
The maximum vertical length
The maximum vertical length
counted from the boiler, including the kit end, is 7 metres Minny 30
and 10 metres Minny 20. Each elbow of 90°, or two of 45°, reduces the available length by 1 metre.
Vertical duct kit
∅
80/125 Stainless steel
Cód. CGAS000181
Vertical duct kit
∅
80/125 Polypropylene
Cód. CGAS000360
Black tile
∅
80/125
Cód. CGAS000074
45º bend
∅
80/125 Stainless steel
Cód. CGAS000183
45º bend
∅
80/125 Polypropylene
Cód. CGAS000081
90º bend
∅
80/125 Stainless steel
Cód. CGAS000182
90º bend
∅
80/125 Polypropylene
Cód. CGAS000080
1 m Coaxial duct
∅
80/125 Stainless steel
Cód. CGAS000184
1 m Coaxial duct
∅
80/125 Polypropylene
Cód. CGAS000082
Black tile
∅
80/125
Cód. CGAS000075
Examples of installation:
5
55
5
FILLING THE INSTALLA
FILLING THE INSTALLA
FILLING THE INSTALLA
FILLING THE INSTALLATION
TION
TION
TION
To fill the installation, it should be provided with a fill valve, which can be used to fill the installation
until a pressure of 1 - 1.5 bars appears on the “boiler pressure” setting on the display. The circuit
should be filled slowly and with the automatic air bleed valve cap
(7)
(7)
(7)
(7)
loose, to let the air out of the
installation. Additionally, open the manual purge bolt
(5)
(5)
(5)
(5)
of the condenser. After purging, close it
again. The air should also be bled from the rest of the installation using the air bleed valves provided.
When the installation has been filled, close the fill valve.
Minny
Minny
Minny
Minny
boilers have a pressure sensor
(9)
(9)
(9)
(9)
for controlling the pressure of the installation. If the
installation pressure drops below a minimum of 0.5 bar, the boiler will not switch on and a low