EN
22
BIOCLASS iC 66
3.5
Installation delivery
After commissioning, the Technical Assistance Service will explain to the user how the boiler functions,
making any observations they consider relevant.
The installer is responsible for clearly explaining to the user the functioning of any control or regulation
device forming part of the installation but not supplied with the boiler.
Upon delivery of the boiler, the user receives the following documents:
•
The boiler installation and operation manual.
•
Combustion analysis performed during commissioning.
•
The commissioning sheet.
Содержание BioClass iC 66
Страница 1: ...Bioclass iC 66 Biomass boiler EN INSTALLATION AND OPERATING INSTRUCTIONS ...
Страница 2: ......