![Doka Platform SCP Скачать руководство пользователя страница 52](http://html.mh-extra.com/html/doka/platform-scp/platform-scp_original-operating-instructions-instructions-for-assembly-and-use_2516579052.webp)
52
999805802 - 03/2016
Start-up phases
Original Operating Instructions
Platform SCP
Suspending platforms from the girder
grille
Working platform with one base beam
➤
Lift in the Suspension profile FRQ
50 in the area of
the Clamping unit FRQ
50
B
(see
the
section
headed
'Assembling the girder grille').
➤
Fix the Suspension profile
FRQ
50 to the Clamping
unit FRQ
50
B and secure it.
➤
Fix the Multi-purpose waling WS10 Top50 of the
working platform to the Suspension profile FRQ
50
and secure it.
A
Platform support (height = min. 950
mm)
B
Platform with one upper base beam
C
Suspension profile FRQ 50
98058-422-10
B
A
A
98058-416-12
C
C
Suspension profile FRQ 50 (project-specific)
D
Clamping unit FRQ 50 B
E
Connecting pin 10cm
F
Spring cotter 5mm
C
Suspension profile FRQ 50 (project-specific)
E
Connecting pin 10cm
F
Spring cotter 5mm
G
Multi-purpose waling WS10 Top50
98058-424-02
E
F
D
C
98058-424-01
E
G
F
C
Содержание Platform SCP
Страница 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Страница 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Страница 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Страница 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Страница 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...