Anchoring on the structure - Lifting unit attached on one side
Original Operating Instructions
Platform SCP
Retrofitting a safe suspension point
Dimensioning the suspension point
Drilling a hole for the suspension point
through the wall
e.g. if the crew forgot to prepare a positioning point.
➤
Drill a hole of diam.
55
mm and 130
mm
depth.
➤
Drill a hole of diam.
28
mm.
➤
Push the sealing sleeve all the way onto the Univer-
sal climbing cone.
➤
Screw the tie rod into the universal climbing cone
until it fully engages.
➤
Put the unit part-way into the borehole.
➤
Paste the ready-mix mortar (site-provided) into the
drilled hole with a spatula.
a ... diam.
28
mm
b ... 130
mm
c ... diam. 55
mm
➤
Insert the unit so that the climbing cone is flush with
the concrete surface.
Scrape away the excess ready-mix mortar with the
spatula.
➤
Before welding the seam, align the wing nut parallel
to the baseplate.
➤
On the other side of the concrete wall, screw on the
Super plate (now welded together) and secure it with
a screw and dowel so that it cannot be unscrewed.
The required
cube compressive strength
of the con-
crete and ready-mix mortar at the time of loading must
be
specified
separately for each project
by the struc-
tural designer
. It will depend on the following factors:
▪
load actually occurring
▪
wall thickness
▪
reinforcement / extra reinforcement steel
▪
distance from edge
The introduction of the forces, the transfer of these
forces into the structure, and the stability of the overall
construction, must all be verified by the structural
designer.
Comply with the manufacturer's specifications
for the ready-mix mortar!
A
Universal climbing cone 20.0
B
Sealing sleeve K 20.0 (expendable anchoring component)
C
Tie rod 20.0mm
D
Ready-mix mortar
A
B
D
C
c
a
b
98037-286-01
☞
Important note:
➤
Weld a seam onto the super plate to join the
nut and the plate. Do this before screwing the
super plate onto the tie rod.
E
Weld-seam
F
Welded Super plate 20.0 B
G
Hexagon timber screw 10x50
H
Dowel, diam. 12
WARNING
➤
Do NOT fit Stop anchors with the anchor
plate left exposed! This must always be
embedded in the concrete.
A
Universal climbing cone 20.0 + Sealing sleeve K 20.0
C
Stop anchor 20.0
98034-228-01
E
98037-287-01
H
G
F
98037-279-01
A
C
Содержание Platform SCP
Страница 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Страница 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Страница 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Страница 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Страница 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...