![Doka Platform SCP Скачать руководство пользователя страница 152](http://html.mh-extra.com/html/doka/platform-scp/platform-scp_original-operating-instructions-instructions-for-assembly-and-use_2516579152.webp)
152
999805802 - 03/2016
Start-up phases – Lifting unit attached on one side
Original Operating Instructions
Platform SCP
3rd casting section
➤
Install the hydraulic system (see the section headed
"Hydraulic system").
➤
Start up the hydraulic unit.
➤
Extend the piston rods of the hydraulic cylinders one
at a time and pin them to the Bracket SP cylinder
connector B with cylindrical pins D80x215.
Make sure that the pivoting bearing is in the right
position.
➤
Secure each cylindrical pin D80x215 with a hexagon
bolt M10x100, a washer and a hexagon nut M10.
➤
Lift the platform to the next position (see the section
headed 'Typical sequence of lifting phases').
A
Hydraulic cylinder SCP
B
Bracket SCP cylinder connector B
C
Cylindrical pin D80x215
98058-457-01
A
B
C
98058-458-07
Содержание Platform SCP
Страница 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Страница 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Страница 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Страница 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Страница 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...