JT40/JT40 All Terrain Operator’s Manual
Systems and Equipment - 157
Electric Strike System
Voltage Test
1.
Place voltage limiter on something insulated from ground and drilling unit (such as dry board or tire),
but near frame of drilling unit.
2.
Clip one lead to frame.
3.
Clip other lead to one voltage limiter mount.
4.
Move simulator switch to "voltage" and press test button.
5.
Watch display screen:
•
Alarm and strobe should turn on.
•
ESID% and voltage "volts" should show 90% or higher.
It is normal for simulator voltage levels to drift below strike level. When this happens, ESID bar should
show less than full and alarm and strobe should stop working. If the level drifts above strike level again,
light, ESID bar, and strobe should be turned on again.
Содержание JT40
Страница 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Страница 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Страница 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Страница 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Страница 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Страница 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Страница 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Страница 247: ...Specifications 246 JT40 JT40 All Terrain Operator s Manual Declaration of Conformity Information ...
Страница 250: ......
Страница 251: ......
Страница 252: ...JT40 JT40 All Terrain Operator s Manual Service Record 251 Service Record Service Performed Date Hours ...
Страница 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...