![Ditch Witch JT40 Скачать руководство пользователя страница 153](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008153.webp)
Systems and Equipment - 152
JT40/JT40 All Terrain Operator’s Manual
Electric Strike System
Electric Strike System
Any time you drill in an electric jobsite, electric strike system must be properly set up, tested, and used.
Drill operator and tracker operator must wear protective boots, and the drill operator must have protective
gloves within reach, all meeting the following standards:
•
Boots must have high tops and meet the electric hazard protection requirements of ASTM F2413 or
ASTM F1117 when tested at 18,000 volts. Tuck legs of pants completely inside boots.
•
Gloves must have 17,000 AC maximum use voltage, according to ASTM specification D120.
If working around higher voltage, use gloves and boots with appropriately higher ratings.
Read and follow “Electric Jobsite Precautions” on page 89. Review safety procedures before each job.
If an electric strike occurs, immediately contact your local Ditch Witch
®
dealer to have the electric strike
system tested.
FCC Statement
The Electric Strike System has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the
FCC rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated
in a commercial environment. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used
in accordance with the instructions, can cause harmful interference to radio communications. Operation of this equipment in a
residential area could cause harmful interference which the user will be required to correct at his own expense.
Changes or modifications not expressly approved in writing by The Charles Machine Works, Inc. may void the user's authority to
operate this equipment.
NOTICE:
The strike system does not prevent electric strikes or detect strikes before they occur.
If
alarms are activated, a strike has already occurred
and equipment is electrified.
Содержание JT40
Страница 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Страница 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Страница 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Страница 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Страница 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Страница 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Страница 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Страница 247: ...Specifications 246 JT40 JT40 All Terrain Operator s Manual Declaration of Conformity Information ...
Страница 250: ......
Страница 251: ......
Страница 252: ...JT40 JT40 All Terrain Operator s Manual Service Record 251 Service Record Service Performed Date Hours ...
Страница 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...