![Ditch Witch JT40 Скачать руководство пользователя страница 240](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008240.webp)
JT40/JT40 All Terrain Operator’s Manual
Service - 239
As Needed
Charging Procedure (Engine Off)
1.
Park service vehicle close to disabled equipment but do not allow vehicles to touch. Engage parking
brake in both vehicles.
2.
Turn the ignition switch to the OFF position in both vehicles, and turn off all electrical loads. Disconnect
the machine controller.
3.
Inspect battery in disabled vehicle (B) for signs of cracking, bulging, leaking, or other damage.
Connect red positive (+) jumper cable clamp to positive (+) post (2) of battery in disabled vehicle first.
4.
Connect the other red positive (+) jumper cable clamp to positive (+) post of battery (A) in the service
vehicle.
5.
Connect black negative (-) cable clamp to negative (-) post of battery (A) in service vehicle.
6.
Connect the other black negative (-) cable clamp to the engine or frame ground on the disabled
vehicle, at least 12” (305 mm) from the failed battery, as shown.
7.
Operate service vehicle engine at 1500-2000 rpm for a few minutes to build an electrical charge in the
failed battery.
8.
Stop engine in service vehicle.
9.
Remove jumper cables from the service vehicle, black negative (-) clamp first. Do not allow clamps to
touch.
10. Remove black negative (-) cable clamp from the disabled engine or frame ground first.
11. Remove red positive (+) cable clamp from the disabled vehicle positive (+) battery post last.
12. Reconnect machine controller and try to start disabled vehicle.
If the disabled vehicle did not start, check for loose or corroded battery cable connections. Poor
connections will prevent current from charging the failed battery. Clean terminals and posts if necessary
and repeat steps above.
IMPORTANT:
Some equipment may have a positive jumper cable terminal (1) located externally.
If so equipped, connect red positive (+) jumper cable clamp to terminal.
Содержание JT40
Страница 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Страница 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Страница 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Страница 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Страница 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Страница 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Страница 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Страница 247: ...Specifications 246 JT40 JT40 All Terrain Operator s Manual Declaration of Conformity Information ...
Страница 250: ......
Страница 251: ......
Страница 252: ...JT40 JT40 All Terrain Operator s Manual Service Record 251 Service Record Service Performed Date Hours ...
Страница 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...