![Ditch Witch JT40 Скачать руководство пользователя страница 174](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008174.webp)
JT40/JT40 All Terrain Operator’s Manual
Systems and Equipment - 173
Drill Pipe
Use Drill Pipe Correctly
Align the Joints
Always carefully align the male and female
ends of pipe before threading them together.
Poor alignment can damage the threads and
destroy the usefulness of the joint.
Clamp Pipe Correctly
Clamp on pipe when joint is between
wrenches. Clamp only on the tool joint of the
drill pipe as shown. This portion of the drill
pipe is designed for clamping and is
considerably thicker and stronger than the
rest of the pipe.
See “Clamp Pipe” on page 124 for more
information.
NOTICE:
If joints get out of alignment
during a bore, use frame tilt or rear
stabilizers to adjust the unit.
NOTICE:
Clamping anywhere else on the
pipe will weaken the pipe. Pipe can later
break, even when operating under normal
loads.
Содержание JT40
Страница 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Страница 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Страница 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Страница 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Страница 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Страница 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Страница 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Страница 247: ...Specifications 246 JT40 JT40 All Terrain Operator s Manual Declaration of Conformity Information ...
Страница 250: ......
Страница 251: ......
Страница 252: ...JT40 JT40 All Terrain Operator s Manual Service Record 251 Service Record Service Performed Date Hours ...
Страница 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...