![Ditch Witch JT40 Скачать руководство пользователя страница 99](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008099.webp)
Prepare - 98
JT40/JT40 All Terrain Operator’s Manual
Plan Bore Path
JT40 HIWS1 Pipe
Minimum depth (D)
Entry pitch (A)
Setback (B)
Depth to begin steering (S)
4’ 4” (1.32 m)
18% / 10.0°
37’ 3” (11.35 m)
2’ 2” (0.66 m)
5’ 4” (1.63 m)
21% / 11.6°
41’ 2” (12.55 m)
2’ 6” (0.76 m)
6’ 8” (2.03 m)
23% / 13.2°
45’ 1” (13.74 m)
2’ 9” (0.84 m)
8’ 0”(2.44 m)
26% / 14.8°
49’ 0” (14.94 m)
3’ 1” (0.94 m)
9’ 4” (2.84 m)
29% / 16.4°
52’ 10” (16.10 m)
3’ 5” (1.04 m)
10’ 11” (3.33 m)
32% / 18.0°
56’ 7” (17.25 m)
3’ 9” (1.14 m)
IMPORTANT:
Numbers in table based on
145’ (44.2 m) minimum bend radius
and beacon housing,
EZ-Connect connector, transition sub, and 1/3 of first drill pipe (L, totaling 12’ 1” [3.68 m]) in the ground
before steering.
Содержание JT40
Страница 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Страница 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Страница 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Страница 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Страница 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Страница 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Страница 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Страница 247: ...Specifications 246 JT40 JT40 All Terrain Operator s Manual Declaration of Conformity Information ...
Страница 250: ......
Страница 251: ......
Страница 252: ...JT40 JT40 All Terrain Operator s Manual Service Record 251 Service Record Service Performed Date Hours ...
Страница 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...