JT40/JT40 All Terrain Operator’s Manual
Transport - 115
Load
Tie Down
Points
Tiedown points are identified by tiedown decals. Securing to trailer at other
points can damage machinery.
Procedure
Loop a transport chain around each tie down point. See chart below for correct distances between tiedown
ends. Make sure tiedowns are tight before transporting.
NOTICE:
•
Wrenches can open after engine shutdown. Ensure that any downhole tool or pipe in wrenches is
attached to spindle or removed before transport.
•
Use Grade 7-3/8” (18.7 cm) transport chain to secure drilling unit.
IMPORTANT:
If hauling unit without pipe box, remove remaining pipe in drill frame chute.
Distance
U.S.
Metric
A
greater than 18”
greater than 45.72 cm
B
less than 50”
less than 127 cm
C
greater than 10”
greater than 25.4 cm
Содержание JT40
Страница 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Страница 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Страница 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Страница 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Страница 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Страница 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Страница 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Страница 247: ...Specifications 246 JT40 JT40 All Terrain Operator s Manual Declaration of Conformity Information ...
Страница 250: ......
Страница 251: ......
Страница 252: ...JT40 JT40 All Terrain Operator s Manual Service Record 251 Service Record Service Performed Date Hours ...
Страница 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...