5 Set-up

5.1 General

The unit must be installed indoors on a level, smooth and hori-
zontal surface. The entire base of the frame should lie directly on
the floor to ensure a good soundproof seal. If this is not the case,
additional sound insulation measures may be necessary. The hy-
draulic tower must be installed in a way that allows maintenance
work to be carried out from the operating side without hindrance.
This can be ensured by maintaining a clearance of 1 m at the
front. Installation must be done in a room protected from frost
and with short pipe runs.
Setup and installation must be performed by a qualified specialist
company.

If the hydraulic power is installed on an upper storey, the load-
bearing capacity of the ceiling should be checked. On account of
the acoustics, measures for isolating possible vibrations should
also be very carefully planned in advance as well. Installation on
wooden floors is not recommended.

5.2 Sound

To prevent solid-borne sound from being transmitted to the heat-
ing system, we recommend connecting the heat pump circuit to
the hydraulic tower using a flexible hose.

6 Installation

6.1 General

The following connections need to be. made on the hydraulic
tower

„

Flow / return flow of the heat pump

„

Flow / return flow of the heating system

„

Drain safety valve

„

Power supply

6.2 Heating System Connection

The heating system connections on the hydraulic tower have a
1 1/4" external thread. A spanner must be used to firmly grip the
transitions when making the connections.
Before connecting the heating water system, the heating system
must be flushed to remove any impurities, residue from sealants,
etc. Any accumulation of deposits in the liquefier could cause the
heat pump to completely break down. For systems where the
heating water flow can be shut off, because of radiator or thermo-
stat valves, the infinitely adjustable circulating pump handles a
demand-related adjustment of the delivery height. The initial fill-
ing and start-up must be carried out by a qualified specialist com-
pany. The entire system including all factory-assembled compo-
nents should be inspected to ensure that everything is working
properly and that there is no leakage.

Minimum heating water flow

The minimum heating water flow through the heat pump must be
assured in all operating states of the heating system. This is en-
sured by the dual differential pressureless manifold.

Antifreeze

A method of manual drainage should be provided for heat pumps
which are exposed to frost. The antifreeze function of the heat
pump controller is active whenever the controller and the heat
circulating pump are ready for operation. If the heat pump is
taken out of service or in the event of a power failure, the system
has to be drained. The hydraulic network should be operated
with a suitable antifreeze if heat pump systems are implemented
in buildings where a power failure cannot be detected (vacation
home).

6.3 Electrical connection

The power supply and control voltage are supplied using stand-
ard cables (load: 3~ 5 wires / 1~ 3 wires; control 3 wires).
For detailed instructions on how to connect the external compo-
nents and how the heat pump controller functions, please refer to
the device connection diagram and the operating manual sup-
plied with the controller.
An all-pole disconnecting device with a contact gap of at least 3
mm (e.g. utility blocking contactor or power contactor) as well as
an all-pole circuit breaker with common tripping for all external
conductors must be installed in the power supply for the hydrau-
lic tower (tripping current in compliance with the device informa-
tion). 
The control voltage must be protected by a 10 A fuse.
On delivery, the 2nd heat generator is connected to 2  kW heat
output. To increase the output to 4  kW or 6  kW, the copper
bridges included in the scope of supply must be connected as
laid out in the circuit diagram.
For detailed information, see Circuit Diagrams in the Appendix.
The pipe heater should only be connected by authorised electri-
cians according to the corresponding circuit diagram. The regu-
lations of the utility company and the national guidelines must be
observed (VDE).

Содержание HPK 200S

Страница 1: ...tower with HPM Tour hydraulique avec gestionnaire WPM Montage und Gebrauchsanweisung Deutsch English Fran ais Instructions d installation et d utilisation Installation and Operating Instructions Beste...

Страница 2: ......

Страница 3: ...t DE 3 3 2 Schaltkasten DE 3 3 3 W rmepumpenregler DE 3 4 Transport DE 3 5 Aufstellung DE 4 5 1 Allgemein DE 4 5 2 Schall DE 4 6 Montage DE 4 6 1 Allgemein DE 4 6 2 Heizungsseitiger Anschluss DE 4 6 3...

Страница 4: ...sicher zu benutzen sollten dieses Ger t nicht ohne Aufsicht oder Anwei sung durch eine verantwortliche Person benutzen Kinder sollten beaufsichtigt werden um sicherzustellen dass sie nicht mit dem Ge...

Страница 5: ...und kann durch L sen der beiden oben liegenden Befestigungsschrauben her ausgeklappt werden Im Schaltkasten befinden sich die Netzanschlussklemmen Hei zungssch tze Nabelschnuranschl sse Verbindungslei...

Страница 6: ...schluss Die heizungsseitigen Anschl sse am Hydrauliktower sind mit 1 1 4 Au engewinde versehen Beim Anschluss muss an den berg ngen mit einem Schl ssel gegengehalten werden Bevor die heizwasserseitige...

Страница 7: ...ler Die Einstellungen m ssen gem dessen An leitung vollzogen werden Die auf dem Typschild angegebenen Betriebs berdr cke d rfen nicht berschritten werden St rungen w hrend des Betriebes werden ebenfal...

Страница 8: ...managers nach Wenn die St rung nicht selbst behoben werden kann verst ndigen Sie bitte den zust ndigen Kundendienst ACHTUNG Arbeiten an der Anlage d rfen nur vom autorisierten und sachkundigen Kunden...

Страница 9: ...sprechdruck Sicherheitsventil bar 2 5 3 6 maximaler Betriebs berdruck bar 2 0 3 7 maximale Betriebstemperatur C 85 3 8 elektrische Rohrheizung kW 2 4 bzw 6 Tauchheizk rper kW bis 6 optional 3 9 Schall...

Страница 10: ...DE 8 Deutsch 11...

Страница 11: ...EN 3 3 2 Switch box EN 3 3 3 Heat pump controller EN 3 4 Transport EN 3 5 Set up EN 4 5 1 General EN 4 5 2 Sound EN 4 6 Installation EN 4 6 1 General EN 4 6 2 Heating System Connection EN 4 6 3 Electr...

Страница 12: ...y or mental abilities or their inexperience or lack of knowledge must not operate this device without supervision or instruction by the person in charge Children must be supervised to ensure that they...

Страница 13: ...osening the two top mounting screws it can be folded open The switch box contains the supply connection terminals heating contactors umbilical cable connections connecting line to the heat pump and th...

Страница 14: ...start up must be carried out by a qualified specialist com pany The entire system including all factory assembled compo nents should be inspected to ensure that everything is working properly and that...

Страница 15: ...als are used Residue from lubricants and sealants may also contaminate the heating water In the case of severe contamination leading to a reduction in the performance of the liquefier in the heat pump...

Страница 16: ...ssure safety valve bar 2 5 3 6 max operating overpressure bar 2 0 3 7 max operating temperature C 85 3 8 electrical pipe heater kW 2 4 or 6 Immersion heater kW up to 6 optional 3 9 Sound power level d...

Страница 17: ...FR 3 3 3 R gulateur de pompe chaleur FR 3 4 Transport FR 3 5 Installation FR 3 5 1 G n ralit s FR 3 5 2 Bruit FR 4 6 Montage FR 4 6 1 G n ralit s FR 4 6 2 Raccordement c t chauffage FR 4 6 3 Branchem...

Страница 18: ...connaissances ne sont pas en mesure d utiliser l appareil en toute s curit ne devraient pas le faire en l absence ou sans instructions d une personne responsable Les enfants doivent tre surveill s pou...

Страница 19: ...facile utiliser Il commande et surveille toute l installation de chauffage en fonction de la temp rature ext rieure ainsi que la production d eau chaude sanitaire et les dispositifs de s curit La son...

Страница 20: ...ion diff rentielle Protection antigel Dans le cas de pompes chaleur expos es au gel il convient de pr voir ventuellement une vidange manuelle La fonction de protection antigel du r gulateur est activ...

Страница 21: ...chauffage peut galement tre souill e par des r sidus de produits de lubrification et d tanch ification Si l encrassement est si fort que la puissance du condenseur de la pompe chaleur s en trouve r du...

Страница 22: ...Surpression de service maximale bars 2 0 3 7 Temp rature de service maximale C 85 3 8 Chauffage tubes lectrique kW 2 4 ou 6 R sistance immerg e kW max 6 en option 3 9 Niveau de puissance sonore dB A 3...

Страница 23: ...Anschlussplan Last Circuit diagram load Sch ma lectrique de charge A VII 3 5 Legende Legend L gende A VIII 4 Hydraulische Prinzipschemen Hydraulic Plumbing Diagrams Sch mas hydrauliques A X 4 1 Hydra...

Страница 24: ...HU IORZ H WHUQDO WKUHDG RW ZDWHU UHWXUQ IORZ H WHUQDO WKUHDG OHFWULFDO FRQQHFWLRQ HDW UHWXUQ IORZ QSXW LQ 3 6 H WHUQDO WKUHDG HDW IORZ 2XWOHW IURP 3 6 H WHUQDO WKUHDG GGLWLRQDO FRQQHFWLRQ RI DQ H SDQV...

Страница 25: ...HVW pTXLSp G XQH DGDSWDWLRQ pOHFWURQLTXH FRQWLQXH GX UHIRXOHPHQW UGHUK KH LQ P HOLYHU KHLJKW LQ P 5HIRXOHPHQW HQ P HL ZDVVHUGXUFKIOXVV LQ P K HDWLQJ ZDWHU IORZ UDWH LQ P K pELW G HDX GH FKDXIIDJH HQ P...

Страница 26: ...pendix Annexes 3 3 Stromlaufpl ne Circuit Diagrams Sch mas lectriques 3 1 Steuerung Control Commande 7 9 9 12 12 12 5 7 5 7 1 1 95 9 WHUP 9 1 1 12 12 12 12 1 12 12 12 12 1 12 1 12 1 1 1 5 G 1 0 1 1 3...

Страница 27: ...A V Anhang Appendix Annexes 3 2 3 2 Last Load Charge...

Страница 28: ...rcuit diagram control Sch ma lectrique de commande 7 3 9 9 12 12 12 5 7 5 7 1 1 95 9 WHUP 9 1 1 12 12 12 12 1 12 12 12 12 1 12 1 12 1 1 1 5 G G 5 5 G G 5 7 7 1 0 0 0 0 1 5 G 1 3 1 3 9 7U 7U 0 1 7 7 1...

Страница 29: ...A VII Anhang Appendix Annexes 3 4 3 4 Anschlussplan Last Circuit diagram load Sch ma lectrique de charge...

Страница 30: ...50 Hz J2 Anschluss f r Warmwasser R cklauf und Aus senf hler Connection for hot water sensor return flow sensor and external sensor Connexion des sondes sur circuit d eau chaude sanitaire sur circuit...

Страница 31: ...erheitstrenntransformator 230 24 VAC 28VA Safety isolating transformer 230 24 V AC 28 VA Transformateur sectionneur de s curit 230 24 V AC 28 VA W1 Steuerleitung 15polig Control line 15 pole Ligne de...

Страница 32: ...4 Hydraulische Prinzipschemen Hydraulic Plumbing Diagrams Sch mas hydrauliques 4 1 Hydrauliktower monoenergetische Betriebsweise Hydraulic tower mono energy operating mode Tour hydraulique en mode mon...

Страница 33: ...ng und gemischtem Heizkreis Hydraulic tower bivalent operating mode optionally with DHW preparation and mixed heating circuit Tour hydraulique en mode bivalent en option avec production d eau chaude s...

Страница 34: ...9 Flanschheizung Warmwasser Flange heater hot water Cartouche chauffante eau chaude sanitaire E10 1 Tauchheizk rper Immersion heater R sistance immerg e E10 2 l Gaskessel Oil gas boiler Chaudi re fuel...

Страница 35: ...A XIII Anhang Appendix Annexes 4 3...

Страница 36: ...sales service addres ses please refer to the Installation and Operating Instructions for Heat Pumps Pour les conditions de garantie et les adresses SAV se r f rer aux instructions de montage et d tili...

Отзывы: