![Digital Equipment StorageWorks RAID Array 410 Скачать руководство пользователя страница 110](http://html1.mh-extra.com/html/digital-equipment/storageworks-raid-array-410/storageworks-raid-array-410_installation-manual_2498885110.webp)
RAID Array 410 to 450 Upgrade
5–12
EK–SM410–UP. A01
Figure 5–2 Trilink Connector
3. With a small blade screwdriver, loosen the captive screws on the trilink connector
(see Figure 5–2) and remove the trilink from the front of the controller. Do not
remove cables or terminators from the trilink or you will interrupt the host SCSI bus.
You will have to work around any SCSI cable or terminator connections when
removing the trilink.
Figure 5–3 RAID Array 410 Controller Panel
4. Remove the maintenance terminal cable (if attached).
5. Loosen the four mounting screws (refer to Figure 5–3) on each side of the front panel
with a blade screwdriver.