Digital PRIORIS ZX Server
Revision History
MCS Logistics Engineering - Nijmegen
7
Table of Figures
Figure 2 - 1 Front Panel Security Doors Lock ..................................................................................................32
Figure 3 - 1 Unlocking and Removing the Side Panel .....................................................................................37
Figure 3 - 2 Server Components (Left Side) .....................................................................................................38
Figure 3 - 3 Server Components (Right Side)...................................................................................................39
Figure 3 - 4 Main Logic Board Components/ Connectors ...............................................................................41
Figure 3 - 5 CPU Module Components and Connectors..................................................................................41
Figure 3 - 6 Power Fan and Control Board Connectors ...................................................................................42
Figure 3 - 7 Prioris ZX 5000 MP Series Server Expansion Board Slots.........................................................43
Figure 3 - 8 Main Logic Board Jumper Locations............................................................................................46
Figure 3 - 9 Removing/Installing a Memory Module.......................................................................................48
Figure 3 - 10 SIMM Socket Locations and Bank Designations ......................................................................49
Figure 3 - 11 SIMM Orientation ........................................................................................................................51
Figure 3 - 12 Installing a SIMM.........................................................................................................................51
Figure 3 - 13 Installing a Half-Height 5¼-Inch Device Into Top-Right Drive Bay .......................................52
Figure 3 - 14 Installing a Full-Height 5¼-Inch Device Into Top-Right Drive Bay ........................................53
Figure 3 - 15 Installing Expansion Brackets .....................................................................................................54
Figure 3 - 16 Installing an Optional Power Supply ..........................................................................................55
Figure 3 - 17 Installing a CPU Module..............................................................................................................56
Figure 3 - 18 Installing a Device Into the Hot-Swap Drive Bay......................................................................57
Figure 3 - 19 Replacing the Server Battery .......................................................................................................58
Figure 3 - 20 Replacing the Secondary Rear Cooling Fan...............................................................................59
Figure 3 - 21 Storage Backplane........................................................................................................................63
Figure 3 - 22 Single Channel SCSI Configuration ...........................................................................................65
Figure 3 - 23 Two Channel SCSI Configuration ..............................................................................................66
Figure 3 - 24 Single Channel SCSI and Single Channel RAID Configuration ..............................................67
Figure 3 - 25 Single Channel SCSI and Dual Channel RAID Configuration .................................................68
Figure 3 - 26 External SCSI Bus Connections ..................................................................................................69
Figure 3 - 27 Connecting an External SCSI Storage Box ................................................................................70