OPERATOR’S MANUAL
Seed Manager SE
11001-1359A-200810
14 / INSTALLATION AND SETUP
CONNECTING SENSORS TO MODULES
IMPORTANT: When connecting sensors to the Material Flow Modules,
all seed sensors installed on a Material Flow Module
must be connected sequentially starting with Row 1 as
shown below.
When correctly connected, row 1 sensor should be connected to the Row 1
input on
b1
. The monitor will then number the sensors from 1 to
n starting
on
b1
, then
b2
,
and so on.
Figure 11
Correct Install
Correct Install
Содержание seed manager
Страница 4: ...OPERATOR S MANUAL Seed Manager SE 11001 1359A 200810 2 SAFETY NOTICES...
Страница 6: ...OPERATOR S MANUAL Seed Manager SE 11001 1359A 200810 4 INTRODUCTION...
Страница 22: ...OPERATOR S MANUAL Seed Manager SE 11001 1359A 200810 20 INSTALLATION AND SETUP...
Страница 46: ...OPERATOR S MANUAL Seed Manager SE 11001 1359A 200810 44 STARTUP...
Страница 64: ...OPERATOR S MANUAL Seed Manager SE 11001 1359A 200810 62 SELF TEST ERROR CODES...
Страница 70: ...OPERATOR S MANUAL Seed Manager SE 11001 1359A 200810 68 SELF TEST ERROR CODES...