- 14 -
Step 3:
1. Insert the Preacher pad post (10) to the Front upright frame (4), then align the hole of Front
upright sleeve (36) & the hole of Front upright frame (4) as shown, fix the Sleeve (36) with Philips
tapping screw (43), finally secured the Preacher pad post (10) with Pop-pin knob (23).
2. Attach the Leg developer (11) to the Front upright frame (4) with Allen bolts (40), Flat washers
(22) & Pivot bolt (45).
3. Insert the Roll foam tubes (15) to the Leg developer (11) as shown, then sleeve the Roll foams
(26) onto the Roll foam tubes (15), and put on the 6 Roll foam end caps (33) to the Roll foam tubes
(15).
4. Insert the Olympic sleeve (17) onto weight loading bar of Leg developer (11), put on the Big
anti-slip clip (27) on the Olympic sleeve (17), and then Secured the Hex bolt on the Olympic sleeve
(17).
5. Put the Preacher bar rack (50) into the U-shaped base of the Leg developer (11), fixed with
L-shaped pin (30).
6. Fix the Preacher pad (56) on the Preacher pad post (10) with Hex bolts (55) & Flat washers (22).
7. Fix the Leg developer (11) to Front upright frame (4) with U-shaped pin (59).
Содержание DHS 6310
Страница 3: ...2 DIAGRAM...
Страница 11: ...10 Overview Drawing...