
50
DHOLLANDIA
17
COMMISIONING & QUALITY CONTROL
Finish the tail lift in accordance with local regulations.
Execute all functions min. 5 times to ensure the tail lift functions correctly. Pay special attention to:
1.
Smooth and quiet operation through the full range of motion of the platform.
2.
Auto tilt at ground level.
3.
Correct alignment of the open platform flush with the extension plate.
4.
Correct stowage of the tail lift in its travel position.
Make sure that the tail lift will be clearly visible in surrounding traffic [Figure 17.1]:
1.
Apply the RD/WH visibility tape on both sides of the platform.
2.
Fit the platform flags to the underside of the flip-over point.
3.
If applicable: connect the flashing platform lights (if not prewired) and verify their function.
If the operator is allowed to travel up and down on the platform, it is strongly recommended to paint a safe-work zone of
400mmx400mm at a safe distance of 250mm removed from the hazardous crushing area between the inboard platform edge and
the extension plate. [Figure 17.2]
Work through the PDI checklist in the appendix and complete the practical load tests indicated. Fill-out the FITTING
DECLARATION.
During weight test, verify if the hydraulic pump pressure suits the maximum rated lift capacity in this particular mounting situation.
Adjust the pressure if too high or too low, seal the pressure relief valve after that using the provided tamper-evident cap.
Figure 17.1
Figure 17.2
400mm
400mm
250mm
400mm
400mm
250mm
Содержание DH-RP.10
Страница 12: ...11 DHOLLANDIA Figure 6 2 MFT MTG...
Страница 34: ...33 DHOLLANDIA Figure 11 5 Figure 11 4...
Страница 50: ...49 DHOLLANDIA...
Страница 53: ...52 DHOLLANDIA EF0583 RM EN EF0565 EN EF0618 EN EF0570 CAP serial nr EF0564 EN EF0563 EN EF0562 EN xxxx...
Страница 65: ...64 DHOLLANDIA Figure 19 4 Figure 19 5...
Страница 75: ...74 DHOLLANDIA...
Страница 76: ...75 DHOLLANDIA...