6.3
Inspections before putting into service for the first time
The owner is obliged to carry out the following checks before the unit is put into operation for the first time:
Activity
Section
Check
Check continuity of the PE conductor connection
-
X
Check emergency-stop device
-
X
Check direction of movement
X
Check 7-segment display
"7-segment display for operating status and fault display",
"Display of software version, operating hours, number of cy‐
X
Check chain lubrication (under arduous conditions, the chain must be lubricated
more frequently)
"Available hoist chains", Page 77
X
Check function of the lifting motion operating limit switch
"Checking operating limit switches", Page 71
X
Check function of the lowering motion operating limit switch
"Checking operating limit switches", Page 71
X
Check cut-off buffer/cut-off spring/operating limit switch actuator
"Checking the cut-off buffers/cut-off springs", Page 86,
"Checking the operating limit switch actuator", Page 72
X
Check control cable and control pendant housing for damage
-
X
Check operation of the brake
-
X
Check hook and hook safety catch
"Checking the load hook", Page 83
X
Tab. 39
6.4
Checks on entering service, handover
WARNING
Unauthorised operation
Danger to life and limb if the machine is operated without previous inspection.
Machines may only be put into service if they have been checked for compliance with the corresponding acci‐
dent prevention regulations.
By means of suitable measures carried out by the owner or on his behalf, the owner must ensure that the load
handling attachments and machinery ready for operation function in complete safety before they are first put into
service. The specified measures must allow for the static and dynamic features of the machinery.
The following checks must be carried out when the installation enters service:
● The supporting structure must be in good condition and the load capacity of the chain hoist must be checked.
● Safety devices must be complete and effective.
● Clearances and safety distances must be maintained.
● The emergency-stop device must be checked by actuating the emergency stop.
When the unit is first put into operation, it must be checked to ensure that it is used as intended in all possible
applications, in each case with the maximum permissible load. Operation of the safety devices must be checked
(e.g. by lifting an overload). At the same time, the behaviour of the chain hoist must be checked when it is not
used correctly.
Various checks of the machine must be carried out before it is handed over:
● Check to ensure it is suitable for operation
● Acceptance inspection
The test and inspection records can be compiled as soon as safe operation of the chain hoist is ensured.
The test and inspection records (test and inspection booklet; observe relevant national regulations) must be hand‐
ed over when the machine is handed over.
The machine may be used as intended after it has been handed over.
54
214
80
2 44/291
113
Содержание DC-Com 1
Страница 39: ...214 802 44 291113 39...
Страница 45: ...Fig 21 214 802 44 291113 45...
Страница 46: ...Fig 22 46 214 802 44 291113...
Страница 102: ...214802ET indd 291113 102 12 Spare parts 12 1 Overview 1 1 reeving 2 1 reeving 42764247 eps...
Страница 104: ...214802ET indd 291113 104 12 3 Parts on the gearbox 42763847 eps...
Страница 106: ...214802ET indd 291113 106 12 4 Chain drive 42764346 eps 1 1 reeving 2 1 reeving...