Installation
Installation Manual
25
Forklift Installation
1. Unpack the 100kW PCS, see “Unpacking the Unit” on page 12.
2. Using the forklift to move the 100kW PCS.
Removing the 100kW PCS from left/right side:
a. Remove the hexagonal nuts and washers securing cabinet to the pallet.
Figure 23.
Releasing a PCS from a Pallet
CAUTION!
T
O
MOVE
THE
100
K
W PCS,
USE
A
FORKLIFT
THAT
HAS
AN
APPROPRIATELY
RATED
LIFT
CAPACITY
AND
A
915
CM
(36-
INCH
)
FORK
SPAN
.
CAUTION!
T
HE
ENCLOSURE
MUST
BE
LIFTED
FROM
THE
BOTTOM
. T
HE
ENCLOSURE
MUST
BE
SUPPORTED
ON
ALL
FOUR
SIDES
WHEN
LIFTING
. P
RECAUTIONS
MUST
BE
TAKEN
TO
AVOID
TIPPING
OF
THE
ENCLOSURE
FRONT
TO
BACK
AND
SIDE
TO
SIDE
DURING
LIFTING
BECAUSE
THE
CENTER
OF
GRAVITY
OF
THE
ENCLOSURE
IS
NOT
THE
CENTER
OF
THE
ENCLOSURE
.
!
!
ON
OFF
STANDB
Y
RUN
FAULT
ON
AC DI
SCONN
ECT
OFF
ON
DC DI
SCONNE
CT
OFF
Содержание 100kW PCS
Страница 1: ...100kW Power Conditioning System PCS Installation Manual Version 1 0 0...
Страница 3: ...Installation Manual ii Warranty 60 Appendix 61 Specifications 61 Glossary 63 Screw Torque Table 65...
Страница 26: ...Installation Installation Manual 22 12 Repeat for the rear panel Figure 20 Closing a Rear Panel...
Страница 38: ...Installation Installation Manual 34 3 Repeat for the rear panel Figure 35 Closing a Rear Panel...