Installation
Installation Manual
12
Unpacking the Unit
Use a forklift to move and place the crate containing the 100kW PCS and the wooden pallet on a
designated location. Make sure the location is clean and prepared prior to moving the crate.
1. Use a ladder to reach the top of the 100kW PCS.
2. Remove the screws securing the top cover.
3. Remove the top cover.
Figure 9.
Removing a Top Cover
WARNING!
The 100kW PCS and crate have a combined weight of approximately 418 kg/921 lbs. DO
NOT attempt to lift and/or move the package/unit by hand. The unit is extremely heavy.
Attempting to move the unit by hand may lead to injury, damage, and even possibly death.
WARNING!
To prevent injury or damage, make sure to check the shockwatch and tiltwatch indicators
throughout the unpacking process.
!
!
ON
OFF
STANDB
Y
RUN
FAULT
ON
AC DISC
ONNEC
T
OFF
ON
DC D
ISCONNE
CT
OFF
Содержание 100kW PCS
Страница 1: ...100kW Power Conditioning System PCS Installation Manual Version 1 0 0...
Страница 3: ...Installation Manual ii Warranty 60 Appendix 61 Specifications 61 Glossary 63 Screw Torque Table 65...
Страница 26: ...Installation Installation Manual 22 12 Repeat for the rear panel Figure 20 Closing a Rear Panel...
Страница 38: ...Installation Installation Manual 34 3 Repeat for the rear panel Figure 35 Closing a Rear Panel...